Exide PAR20 manual Table of Contents

Page 2

SECTION 1:

SECTION 2: 2.0 2.1 2.2 2.3 2.3.1 2.4 2.5

SECTION 3: 3.0 3.1

SECTION 4: 4.0 4.1 4.2

SECTION 5: 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.7.1 5.8 5.9 5.10

SECTION 6: 6.0 6.1 6.2 6.3 6.4

TABLE OF CONTENTS

 

GENERAL

6

SAFETY MESSAGES

6

General Information

6

Sulfuric Acid Burns

6

Explosive Gases

6

Electrical Shock and Burns

6

Static Discharge Precautions for Batteries

6

Safety Alert

6

Important Message

6

DELIVERY INFORMATION

7

Receipt of Shipment

7

Concealed Damage

7

STORAGE INFORMATION

7

Storage Prior to Installation

7

Storage Location

7

Storage Interval

7

INSTALLATION CONSIDERATIONS

7

General

7

Space Considerations

7

Battery Location & Ambient Temperature Requirements

7

Temperature Variations

9

Ventilation

9

Floor Loading

9

Floor Anchoring

9

Connecting Cables: Battery System to Operating Equipment

9

Paralleling

9

Stacking Limitations

10

Terminal Plates

10

Grounding

10

UNPACKING

10

General

10

Accessories

10

Recommended Installation Equipment and Supplies

10

Unpacking

11

Handling of Modules

11

Image 2
Contents Page Table of Contents System Arrangements 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1 Appendices List of IllustrationsList of Tables Appendix aSulfuric Acid Burns Safety MessagesGeneral Explosive GasesInstallation Considerations Delivery InformationPage Table a Unpacking Table BUnpacking Modules System AssemblySystem Arrangements Handling ModuleTIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage Beam Hardware Installation Beam Support InstalledTip Over Procedure Bottom Supports I-beamsTIP-OVER Procedure Module After TIP-OVER Horizontal Stacking SHACKLE-STRAP UsagePositioning Horizontal Base Modules Installing Completed Hardware Horizontal StackElectrical Connections TIE Plate Assemblies Horizontal StacksIdentification Labels Stack ConnectionsTerminal Plate Kit Materials & Assembly Description QTY PER SystemStep Protective Module CoversInitial Charge Table CModule Clear Cover Materials and Assembly Description QTY PER SystemRecommended Float Range @77F Battery OperationTemperature Correction Table D Equalizing ChargeEffects of Float Voltage Ohmic MeasurementsRecordkeeping Table ECapacity Testing Unit CleaningMaintenance TAP ConnectionsAbsolyte Battery Maintenance Report Type MANUF. Date Install Date System Voltage Battery Temperature C 100 103 104 105 106 107 108 109 110 111 112 113Bonding & Grounding of Battery Rack Appendix CPage Exide Technologies Industry Leader