Bard QW4S1 General, Minimum Installation Height, Proper Handling of Unit After Removal from Skid

Page 8

FIGURE 3

PROPER HANDLING OF UNIT

AFTER REMOVAL FROM SKID

Q-Tec UNIT (RIGHT SIDE)

STRAP

APPLIANCE CART

COMPRESSOR

REMOVAL OF WALL BRACKET FROM SHIPPING LOCATION (UNITS WITH BLANK OFF PLATE ONLY)

The wall brackets are attached to the back of the unit. Remove and retain the wall brackets for use when attaching the unit to the wall. In units equipped with a ventilator a wall sleeve is required and these two wall brackets are not included. A different style bracket is supplied with the sleeve assembly.

GENERAL

The equipment covered in this manual is to be installed by trained, experienced service and installation technicians.

The unit is designed for use with or without duct work. For use without duct work, Plenum Box QPB** is recommended.

These instructions explain the recommended method to install the water source self-contained unit and the electrical wiring connections to the unit.

These instructions and any instructions packaged with any separate equipment required to make up the entire air conditioning system should be carefully read before beginning the installation. Note particularly “Start Procedure” and any tags and/or labels attached to the equipment.

While these instructions are intended as a general recommended guide, they do not supersede any national and/or local codes in any way. Authorities having jurisdiction should be consulted before the installation is made. See Page 4 for information on codes and standards.

Size of unit for a proposed installation should be based on heat loss calculation made according to methods of Air Conditioning Contractors of America (ACCA). The air duct should be installed in accordance with the Standards of the National Fire Protection Systems of Other Than Residence Type, NFPA No. 90A, and Residence Type Warm Air Heating and Air Conditioning Systems, NFPA No. 90B. Where local regulations are at a variance with instructions, installer should adhere to local codes.

MINIMUM INSTALLATION HEIGHT

The minimum installation height of the unit with a Free Blow Plenum is 8 ft. 9 in. This provides enough clearance for the plenum to be removed. See Figure 5.

The minimum installation height for ducted applications is 8 ft. 9 in. This provides enough clearance to install the duct work. See Figure 6.

Manual

2100-532B

Page

8 of 46

Image 8
Contents QW2S1 QW3S1 QW4S1 QW5S1 Bryan, OhioContents Figures Getting Other Information and Publications For More INFORMATION, Contact These PublishersElectrical Specifications QW Model NomenclatureUnit Dimensions Shipping Damage Unit Removal from SkidHandling Unit After Removal from Skid Removal of Unit from SkidProper Handling of Unit After Removal from Skid Minimum Installation HeightGeneral Installation of Unit Through Wall with Wall Sleeve Installation with Free Blow Plenum Ducted ApplicationDuct Work FiltersCondensate Drain Supply Duct ConnectionsCondensate Drain Optional Rear DrainRear Drain TOP View Commercial Room Ventilator OptionTEC Energy Recovery Ventilator Option Removal of the Q-TEC Energy Recovery VentilatorRemoving Locking Screws from Wheels Installation InstructionsMounting the Unit Unit Mounting Without Ventilation Wall Sleeve Component Location Wiring Main Power Wiring LOW Voltage WiringOperating Voltage Range Wall ThermostatsLOW Voltage Connections for DDC Control Blower Motor LOW Voltage Wire Harness PlugLOW Voltage Connections Remote Thermostat Wiring Diagram Option 24VACRemote Thermostat Wiring Diagram Thermostat Option Plug #1 Adjustments Start UPDescription of Standard Equipment Compressor Control ModuleOptional CFM Service Hints Important Installer NotePhase Monitor Delay on Make TimingIndoor Blower Performance Pressure Service PortsPiping Access to Unit Opening Rear of Unit Fluid Access From Floor Fluid Connections on Unit with Ventilation Wall SleeveFluid Connections on Unit Without Ventilation Wall Sleeve Pressure Table Flow Rate for Various FluidsOptional Accessories Circulation System Circulation System DesignCopper Water Coil Application Start UP Procedure for Closed Loop System Water Temperature and Pressure ProcedurePerformance Model DORFC-1 Loop Pump Module Performance Model DORFC-2 Loop Pump ModuleConstant Flow Valves Piping DiagramWater Connections System Start UP Procedure for Open Loop Applications Well Pump SizingRemedies of Water Problems Water CorrosionLake and Pond Installations Cleaning Water CoilWater Well System Cooling Tower / Boiler Application Water Flow and Pressure DropWater Source Heat Pump Water Source Heat Pump Service Unbrazing System ComponentsTroubleshooting GE ECM Motors Don’tTroubleshooting GE ECM Motors CONT’D Replacing ECM Control ModuleCommon Cause Occasional Cause Denotes Ground Source Heat Pump Performance Report Following Information is Needed To Check Performance of Unit