Preparing the tool
Selecting compressor
Select a compressor that has ample pressure and air output to assure
Thus, for example, if nailing takes place at a rate of approximately 40 times per minute at a compression of
0.8MPa (120 PSI). a compressor with an air output over 3CFM is required.
Pressure regulators must be used to limit air pressure to the rated pressure of the tool where air supply pressure exceeds the tool’s rated pressure. Failure to do so may result in serious injury to tool operator or persons in the vicinity.
| (ft /3min.) |
|
|
|
|
|
|
|
|
| PSIG) |
|
| PSIG) |
|
|
| PSIG) |
| ||||
| 4 |
|
|
|
|
|
|
|
|
|
| (120 |
| (100 |
|
| (85 |
| |||||
|
|
|
|
|
|
|
|
|
| 2 |
|
|
|
|
| G |
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
| G |
|
|
| 2 |
|
|
|
| PSIG) |
|
|
|
|
|
|
|
|
|
| G |
|
| 2 |
| kgf/cm |
|
| G |
|
|
| ||
minute |
|
|
|
|
|
|
|
| kgf/cm | kgf/cm |
|
|
|
| (65 |
| |||||||
3 |
|
|
|
|
|
|
|
|
|
| 6 |
|
|
|
| 2 |
| ||||||
|
|
|
|
|
|
|
|
|
| .0 |
|
|
| .0 |
|
| kgf/cm |
|
|
| |||
|
|
|
|
|
|
|
| . 5 |
|
|
|
|
|
|
|
|
|
| |||||
per |
|
|
|
|
| 8 |
| 7 |
|
|
|
| .5 |
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
|
|
|
|
|
|
| |
outputair |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Compressor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| 0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| 10 | 20 |
| 30 |
|
| 40 |
| 50 |
| 60 | ||||||||||||
|
|
|
|
|
|
|
|
|
Nailing frequency (times/min.)
Selecting air hose
CAUTION. Low air output of the compressor or a long or smaller diameter air hose in relation to the nailing frequency may cause a decrease in the driving capability of the tool.
Tool lubrication
This framing nailer requires lubrication BEFORE initial use and BEFORE and AFTER each additional use throughout its life.
1.Disconnect the air hose, turn the framing nailer so the air inlet (12) is facing up. Place
2.Lubricate the contact safety mechanism (1),
the latch (9), and the trigger (4) periodically.
3.After lubrication, run framing nailer briefly. Wipe off any excess oil from the exhaust port (3). The work surface can become damaged by excessive lubrication.
4.Framing nailer repairs must be done by a qualified and experienced service dealer.
Apply a few drops of oil to the trigger mechanism
Use an air hose with a large diameter and as short as possible to assure continuous, efficient nailing operation.
With an air pressure of 0.80 MPa (120 PSI), an air hose with an internal diameter of over 6.5mm (1/4”) and a length of less than 20 m (6.6 ft.) is recommended when the interval between each nailing is 0.5 seconds. Air supply hoses shall have a minimum working pressure rating of 1.06 MPa (150 PSI) or 150 percent of the maximum pressure produced in the system whichever is higher.
Apply a thin coat of lightweight grease to the contact safety mechanism and the latch
Place a few drops of
13