Patton electronic 2621, 2603, 2635 manual Serial Port Configuration

Page 49

Models 2603, 2621, and 2635 Getting Started Guide

5 • Serial Port Configuration

 

 

Time Slot Select. For unframed E1 service (Clear Channel) go to the “Line Option” parameter and select “Clear Channel E1 (G.703).” For a full framed E1 enter 1-31, for partially filled E1 enter the range of timeslots using the format for example: 1,2,3,5; or 1-5,10-31. Any entry for timeslots above 31 will return and invalid selection message.

Line Options: Choose from Clear Channel E1(G.703) or Channelized E1(G.703/G.704). Consult with your service provider which option is required.

Line Code: Choose from AMI or HDB3. Most E1 applications use HDB3.

Line Build Out: Select 120 Ohms if the E1 connection is made via the RJ-48C connector, select 75 Ohm if the E1 connection is made via the dual BNC connectors.

FDL Mode: FDL is a T1 application, therefore select ‘Fdl- none’ for E1 applications.

Clocking Mode: Options are Internal or Receive Recover Clock (network). In most applications clocking for the 2603 will be derived from the E1 network, set the unit for Receive Recover unless instructed otherwise by your service provider.

Idle code: Options are Enabled or Disabled. When idle code is Enabled, the 2603 inserts idle codes (7E hex) on unused timeslots. Set this option to Disabled unless instructed otherwise.

Power Down: Options are Normal and Powerdown. When powered down, the E1 will put high impedance on the input and output lines to protect the device—set unit to Normal for regular operation.

Once all options have been selected, click on the Configure and Activate button at the bottom of the screen. Additionally, save the configuration by going to the System Configuration > Save menu.

This concludes the E1 interface configuration via the web browser, go to section “WAN Service Configuration” on page 52 for instructions on router/bridge and WAN service configuration.

WAN Serial Port Configuration

49

Image 49
Contents IPLink Series High Speed Routers Mailsupport@patton.com Summary Table of Contents Contents Contents Models 2603, 2621, and 2635 Getting Started Guide Remote Site Configuration Central site configuration EMC Ethernet Cable 123 Adapter Contents Models 2603, 2621, and 2635 Getting Started Guide List of Figures Models 2603, 2621, and 2635 Getting Started Guide List of Tables Audience About this guideStructure Impaired functioning PrecautionsGeneral observations Safety when working with electricityTypographical conventions used in this document Factory default parametersGeneral conventions General Information Chapter contentsGeneral attributes IPLink Series High Speed Routers overviewProtocol support EthernetPPP Support WAN InterfacesFront Panel Status LEDs and Console Port SecurityConsole port Rear panel connectors and switchesEthernet port outlined in green Power connectorGeneral Information Product Overview Introduction Sync Serial Application Applications OverviewInitial Configuration Interface cable installation Hardware installationWhat you will need RJ-48C pinout diagram Models 2603, 2621, and 2635 Getting Started Guide Mechanical serviceability Case being opened with a screwdriver Ethernet connector Interface connector RJ-45 DB-25 DCE Installing the AC power cordInitial Configuration Do the following Installing the Ethernet cableWeb Operation and Configuration IP address modificationPC Configuration Web BrowserModel 2603 home Model 2635 home Ethernet LAN Port Ethernet Port LAN ConnectionsBasic Ethernet port attributes Configurable Ethernet parameters Serial Port Configuration Serial Interface WAN Serial Port ConfigurationVariables T1/E1 Interface Configuration Web Interface ConfigurationWeb Configuration , enter username See figure Configuring the IPLink Series 2603 for T1 OperationConfiguring the IPLink Series 2603 for E1 Operation Line Options Fractional T1Serial Port Configuration PPP Bridged WAN ServicesWAN Services PPP Configuration WAN Service ConfigurationPPP Bridged Leave User name and Password blank. Click on Create Remote site configuration PPP RoutedClick on Create Click the Update button PPP link status LMI Configuration LMI Management Frame Relay linksWeb Configuration Methods Dlci Number Use Frame Relay ConfigurationFrame Relay bridged creation Frame Relay bridgedCentral site configuration Relay Frame Relay RoutedDescription FR routed Frame Relay Channel Routed configuration Cost Interface frame-0 WAN Services Security Configuring the router Click on Create a new serviceClick on the Create a new Ip route... hyperlink Valid gateway route Configuring the security interfacesSecurity configuration home Define ‘ppp-0’ interface as External Configuring Security PoliciesFirewall Portfilters Enabling the FirewallDeleting a security Policy Add Raw IP Filter Security TriggersConfiguring TCP port filter for FTP Adding trigger for FTP data transfer Attack Name Protocol Attacking Host Blacklisted? Intrusion Detection System IDSSecurity Enabling NAT Introduction to NATGlobal address pool and reserved map Click on Add Global Address Pool button Dhcp and DNS Configuration Services and features normally associated with each other NAT Dhcp ServerDhcp Server web Dhcp server configuration web Parameters for the Dhcp Server subnetDhcp IP address pool IP Addresses to be available on this subnetDNS server option information Example based on default range of IP address poolAdditional option information Default gateway option informationDhcp Relay Configuration of the Dhcp RelayDhcp Relay webpage Configuring the DNS Relay DNS RelayDNS Relay configuration webpage IP Services WEB Server IP ServicesCLI Configuration Associated Ports for the different System IP Services System Configuration Authentication web page showing default superuser AuthenticationAccess the configuration and status of the alarms AlarmAlarm & Alarm Error Log configuration Remote AccessBackup/Restore UpdateSave Restart Website SettingsSnmp Daemon Error LogSnmp Daemon configuration System ToolsSntp Client Configuration Configuring the Sntp Client Sntp Client Mode Configuration ParametersSntp Client General Configuration Parameters System Clock SettingConfiguration of the internal system calendar clock System Status Port Connection Status System StatusWAN Status LAN StatusHardware Status Defined InterfacesStatus LEDs Contacting Patton for assistance Contact information Warranty coveragePatton support headquarters in the USA Returns for credit Out-of-warranty serviceReturn for credit policy RMA numbersEMC Appendix a Compliance informationCompliance SafetyRadio and TV Interference FCC Part CE Declaration of ConformityAuthorized European Representative Appendix B Specifications Ethernet General CharacteristicsSync Serial Interface T1/E1 InterfacePPP Support Protocol SupportManagement Power and Power Supply Specifications DimensionsAC universal power supply VDC power supplyAppendix C Cable Recommendations Adapter Ethernet CableAppendix D IPLink Physical Connectors RJ-45 non-shielded RS-232 console port EIA-561 RJ-45 shielded 10/100 Ethernet portSerial port 35 M/34 and DB-25 ConnectorPin No Circuit Signal Name Direction 21 DB-15 ConnectorPin No Signal E1/T1 RJ-48C ConnectorAppendix E Command Line Interface CLI Operation CLI Terminology Using the ConsoleLocal VT-100 emulation Remote TelnetThen Setting user passwords Administering user accountsAdding new users Controlling login access Changing user settingsControlling user access
Related manuals
Manual 133 pages 40.62 Kb Manual 8 pages 11.19 Kb