Woodstock M1049 manual Grounding Requirements, Extension Cords, 50 ft

Page 15

D('+09\eZ_kfgCXk_\D]^%J`eZ\/&'0

Grounding Requirements

This machine MUST be grounded. In the event of certain types of malfunctions or breakdowns, grounding provides a path of least resistance for electric current to travel—in order to reduce the risk of electric shock.

Improper connection of the equipment-grounding wire will increase the risk of electric shock. The wire with green insulation (with/without yellow stripes) is the equipment- grounding wire. If repair or replacement of the power cord or plug is necessary, do not connect the equipment- grounding wire to a live (current carrying) terminal.

Check with a qualified electrician or service personnel if you do not understand these grounding requirements, or if you are in doubt about whether the tool is properly grounded. If you ever notice that a cord or plug is damaged or worn, disconnect it from power, and immediately replace it with a new one.

For 110V Connection

This machine is equipped with a power cord that has an equipment-grounding wire and a NEMA 5-15 grounding plug. The plug must only be inserted into a matching receptacle (see Figure 6) that is properly installed and grounded in accordance with local codes and ordinances.

Extension Cords

We do not recommend using an extension cord with this machine. Extension cords cause voltage drop, which may damage electrical components and shorten motor life.

Voltage drop increases with longer extension cords and the gauge smaller gauge sizes (higher gauge numbers indicate smaller sizes).

Any extension cord used with this machine must contain a ground wire, match the required plug and receptacle, and meet the following requirements:

Minimum Gauge Size at 110V

14 AWG

Maximum Length (Shorter is Better)

50 ft.

110V

GROUNDED

5-15 RECEPTACLE

 

Grounding Prong

5-15 PLUG

 

Neutral Hot

Figure 6. NEMA 5-15 plug & receptacle.

;F EFK df[`]p k_\ gifm`[\[ gcl^ fi lj\ Xe X[Xgk\i `] k_\ gcl^ n`cc efk ]`k pfli i\Z\gkXZc\% K_`j `j Xe `e[`ZXk`fe k_Xk pfli gfn\i jlggcp Z`iZl`k [f\j EFK d\\k k_\ i\hl`i\d\ekj ]fi k_\ dXZ_`e\2 _Xm\ Xe \c\Zki`Z`Xe `ejkXcc k_\ Zfii\Zk gfn\i jlggcp Z`iZl`k% @] k_\ dXZ_`e\ dljk Y\ i\Zfee\Zk\[ ]fi lj\ fe X [`]]\i\ek kpg\ f] \c\Zki`Z Z`iZl`k# k_\ i\Zfee\Zk`fe j_flc[ Y\ dX[\ Yp X hlXc`]`\[ \c\Zki`Z`Xe fi j\im`Z\ g\ijfee\c2 X]k\i i\Zfee\Zk`fe# k_\dXZ_`e\dljkZfdgcpn`k_XcccfZXc Zf[\jXe[fi[`eXeZ\j%

<C<:KI@:8C

-13-

Image 15
Contents 7C8=IDEA6I= Page Table of Contents JIM@ D8@EKE8E FGI8K@FEJ JKLG G8IKJ Woodstock Technical Support Introduction@EKIFLK@FE @EKIFLK@FE @EKIFLK@FE Controls and Features For Your Own Safety Read Manual Before Operating Machine SafetyJ8=KP Additional Safety Instructions for Lathes Avoiding Potential Injuries Nema ElectricalCircuit Requirements AmpsGrounding Requirements Extension Cords50 ft Inventory SetupInstalled Accessories Figure Qty Packaged Accessories FigureCleaning Machine Machine PlacementJKLG Uncrating & LiftingTest Run and Break-In To begin the test run procedure, do these stepsGeneral Lathe OperationsChuck and Faceplate Mounting Disconnect Power to the LatheTo remove a set of jaws, do these steps Replacing JawsUsing the Four-Jaw Chuck To install the four-jaw chuck, do these stepsTo load a workpiece in the four-jaw chuck, do these steps To install the faceplate, do these steps Using the FaceplateTo use the tailstock, do these steps Using the TailstockTo setup the tailstock to cut tapers, do these steps Tailstock AlignmentTo align the tailstock, do these steps =`li\22% Tailstock adjustment option #2 Using Centers Using the Steady Rest Using the Follow RestTo use the steady rest, do these steps Setting Compound Slide Using the Tool PostsTo set the angular position, do these steps Longitudinal Handwheel Using Manual FeedSetting RPM To determine and set the needed cutting RPM, do these stepsCutting Speeds for High Speed Steel HSS Cutting Tools RPM Chart To set and engage the power feed, do these steps Setting Power Feed RateTo setup for threading, do these steps Threading SetupGeneral Lubrication MaintenanceGeneral Maintenance General Cleaning=`li\43%End-cap bushing and tailstock Ball oilers Service Cross-Slide and Saddle Gib AdjustmentsCross Slide Backlash To replace the cogged-belt, do these steps Replacing the V-BeltReplacing the Cogged Belt To replace the V-belt, do these steps HL8C@=@CKI@@8E% Due to Electrical Safety InstructionsStop Wiring DiagramMotor & Electrical TroubleshootingOperation and Work Results +09\eZkfgCXk\D%J`eZ\/&0 Drive Belt PartsBelt Tensioner Change Gears Headstock Quick-Change Gearbox Front View ApronApron Parts List Saddle & Cross Slide Compound Rest & Tool Post Tailstock Follow Rest Steady RestBed XPS09M Electrical & ToolsGrouped Warnings Label Machine LabelsPage Page Page Place Stamp Here N8II8EKP =\FjVainBVXcZhVcYIddah