On/Off Switch Replacement
120 Vac
Removal
1. Relieve pressure; page 6.
2.Fig. 10 and 11. Remove four screws (18) and pressure control cover (39).
3.Disconnect two wires (A) from ON/OFF switch (23).
4.Remove toggle boot (25) and locking ring (24). Remove ON/OFF switch (23).
Installation
1.Install new ON/OFF switch (23). Install locking ring (24) and toggle boot (25).
2.Connect two wires (A) to ON/OFF switch.
3.Install pressure control cover (39) with four screws (18).
25
24
| 35 | 37 |
| A |
|
23 | 36 |
|
|
| |
18 |
|
|
22
D E
52
39
ti0057b
Fig. 10
14309063