ASSEMBLY INSTRUCTIONS/OPERATIONS
FIGURE 47
FIGURE 46
7)Clean and inspect the internal hexagon bushing for damage and excessive wear. Replace the bushing if required.
8)Position the bearing block on the arbor press with the bearing facing down. Determine that the bearing block is properly supported. Using the arbor press and an appropriate sized thrust bushing, remove the bearing from the block. FIGURE 47.
9)Clean the inside bore diameter of the bearing block and inspect for damage.
10)Clean the outside diameter of the replacement bearing. Apply a suitable amount of anaerobic adhesive/sealant to the outside diameter of the bearing. Align and press the replacement bearing into the bearing housing until it seats itself against the flange. FIGURE 48.
FIGURE 48
11)Position the bearing block with the bearing facing down. Determine that the bearing block and replacement bearing are both properly supported. Using the arbor press, align and press the internal hexagon bushing into the bearing block until it seats itself against the flange. FIGURE 49.
12)Reinstall the snap ring on the internal hexagon bushing.
CAUTION
Wear safety glasses and other appropriate apparel when removing/installing the snap ring or performing any work with an arbor press. Caution all onlookers about the possibility of flying debris and personal injury.
8FP FLOOR PLANER SERIES | OPERATION AND PARTS MANUAL REV #2 (05/28/09) | PAGE 38 |
|
|
|