Multiquip 8FP Series manual Aligning the Caster Wheels

Page 40

ASSEMBLY INSTRUCTIONS/OPERATIONS

ALIGNING THE CASTER WHEELS.

Application: All Models.

Tools Required:

1each, 16 inch minimum length straightedge

2each, 3/4 inch wrenches

1each, torque wrench, 85 ft lbs (115 Nm.) capacity with 3/4 inch socket.

1each, 6 inch scale.

Proper front and rear caster wheel alignment is essential to produce an even cutting action by the flails. With use, caster bearings and axles will eventually wear. Excessive caster bearing and axle wear can contribute to an uneven cutting action. In addition, a sharp blow delivered to the Floor Planer (eg; being dropped to the surface from off a truck) can also affect the caster wheel alignment.

Caster wheels are aligned during assembly with the use of a specially designed alignment jig. However, satisfactory results can also be achieved in the field by following steps:

1)Position the Floor Planer on a suitable work surface. If the Floor Planer is powered by an engine and the engine is not to be removed, fuel and oil must be first drained from the fuel tank and crankcase. If powered by an electric motor, disconnect the extension cord or Floor Planer from the power source. The normal position for aligning the caster wheels is with the main frame perpendicular to the work surface. Support the unit with proper blocking.

2)Shim washers of .015 inch (.381 mm) thickness are sometimes utilized when fastening the front axle assembly to the main frame. Install washers as required. FIGURE 50. The fasteners that attach the front axle assembly should be tightened until slight tension is applied. Always position the 1/2 inch flat washers against the slots provided in the axle assembly.

3)Position the front casters so that their faces extend approximately 7/16 inch (11.1 mm) beyond the bottom surface of the main frame. Caster wheels have a slight curvature on their faces. The measurement should be taken at the high point of the curvature. FIGURE 51.

FIGURE 51

4)Push the rear casters towards the main frame until the upper limit stop is encountered. FIGURE 52.

5)Place the straightedge between the front and rear casters on the high point of the face curvature. Adjust the front casters so that the gap between the straight- edge and the bottom of the main frame is identical. This gap figure is approximately 1/8 to 1/4 inch (3.17 to 6.35 mm). It is important that the straightedge be positioned on both sets of casters in the same relative position on the caster faces. FIGURE 53.

6)Tighten the fasteners with the torque wrench to 85 ft lbs (115 Nm.). The addition of clamps will minimize any movement or location change while tightening the fasteners.

FIGURE 52

FIGURE 50

8FP FLOOR PLANER SERIES

OPERATION AND PARTS MANUAL REV #2 (05/28/09)

PAGE 40

 

 

 

Image 40
Contents Electric and Gasoline Floor Planers Model 8FP Series Page Table of Contents Table of Contents Page Parts Ordering Procedures Page Page Operator Instructional Data Sheet Safety Precautions Safety Precautions Operation MAINTENANCE, Repair and Storage Application All Models Removing the Floor Planer from the PalletFilling the 8FP/G Series Engine Fuel Tank Theory of Operation Flail Design and ApplicationStar Flail Beam FlailPentagonal Flail Milling FlailSpacer Washers Function of Spacer WashersProblems encountered by uneven component wear Flail Drum Design and Application Installing Flails on the TWO Section Drum General Notes Regarding Flail DrumsNormal installation procedure for milling flails General Notes Regarding the Installation of Flails Installing a Loaded Drum on the DriveshaftTransporting the Floor Planer Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Operating the Floor Planer on the JOB Site Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Stopping the 8FP/G Series Gasoline Powered Floor Planer Stopping the 8FP/E Series Electrically Powered Floor PlanerPreventative Maintenance Check LIST. Application All Models Observe all applicable safety precautions for the solvent Installing a Replacement V-BELT or Pulley Application As SpecifiedAssembly INSTRUCTIONS/OPERATIONS Application All Models Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Assembly INSTRUCTIONS/OPERATIONS Aligning the Caster Wheels Checking Driveshaft RUN OUT Page Engine Service MAINTENANCE/SERVICEApplication 8FP/G Series Floor Planer Troubleshooting Accelerated Bearing Wear AND/OR Failure Accelerated V-BELT WearUneven Cutting Action Storage StorageFrame GeneralExplanation of Code in Remarks Column Suggested Spare Parts Qty DescriptionMain Frame Assembly Main Frame AssyMain Frame Assy Part Name QTY FRAME, MainTUBE, Vacuum Axle MountDriveshaft Assembly Driveshaft AssyDriveshaft Assy Part Name QTY. Remarks RING, Retaining ExternalSHEAVE, Driveshaft KEY, SpecialRear Frame Assembly Rear Frame AssyRear Frame Assy Part Name QTY Remarks PIN, Roll 3/16 X 1 PlatedBUSHING, Connex SHAFT, Hinge PlatedOperator Handle Assembly Gasoline Operator Handle Assy GasolineBOOT, Rubber BARREL, AdjustingSWITCH, SHUT-OFF TAP, 22-18 Guage WireGasoline Engine Assembly Gasoline Engine AssyPart Name QTY. Remarks FRAME, Main GX160KQXC9 ENGINE, Honda 5.5HPDrive Pulley BUSHING, Center HUBOperator Handle Assembly Electric Operator Handle AssyHeight Adjustment Screw Adjusting Tube Switch MountHOUSING, Switch SWITCH, ON/OFFElectric Motor Assembly Electric Motor AssyMOTOR, Electric 5HP Motor PlateRELIEF, Strain NUT, BulklheadONE Section Drum Assembly ONE Section Drum AssyONE Section Drum Assy Part Name Flail Drum END CAPFlail Drum ROD WASHER, Lock 1/4TWO Section Drum Assembly TWO Section Drum AssyTWO Section Drum Assy Part Name Flail Drum 2 SectionFLAILS, Spacers and Washers Assembly Flails & Spacer Washers AssyFLAILS, Spacers and Washers Assy Part Name QTY Star FlailSpacer Washer Beam FlailDecals Decals Part Name QTY Remarks Decal Warning FlailsDecal Depth Control Decal MQ LogoEffective February 22 Page HERE’S HOW to GET Help