Grizzly G0763 Motor Wiring Diagrams, To Electrical Cabinet, Spindle Motor Wiring clockwise

Page 48

Motor Wiring Diagrams

To Electrical

Cabinet Page 42

W2

W1

 

 

Gnd

 

W1

V1

U1

 

W2

W2

W1

 

 

Gnd

 

W1

V1

U1

 

W2

CBB60

Run

Capacitor

25MF 450V

 

 

 

W1

U1

 

 

V1

 

 

 

 

 

V2

U2

W1

W2

V2

E348072

Start

Capacitor 108-130MF 250V

CBB60

Run

Capacitor

25MF 450V

 

 

 

W1

U1

 

 

V1

 

 

 

 

 

V2

U2

W1

W2

V2

E348072

Start

Capacitor 108-130MF 250V

Spindle Motor Wiring (clockwise)

Spindle Motor Wiring (counterclockwise)

Coolant Pump Motor

220V (Prewired)

 

CBB60A

 

 

Run Capacitor

 

 

6MF 450V

 

 

4

 

 

2

 

 

5

 

 

6

 

Gnd

1

3

 

 

 

 

W2

U2

 

PE

 

Coolant Pump Motor

(Rewired to 110V)

 

CBB60A

 

 

 

Run Capacitor

 

 

 

6MF 450V

 

 

 

4

 

 

 

5

 

 

2

 

 

 

 

6

 

 

Gnd

1

3

4

2

 

 

W2

 

U2

 

PE

 

 

Figure 55. Spindle motor

wiring (clockwise).

Figure 56. Coolant motor

wiring (220V).

-46-

READ ELECTRICAL SAFETY

 

ON PAGE 40!

Model G0763 (Mfg. Since 8/13)

Image 48
Contents Model G0763 18 Surface Grinder Page Table of Contents Introduction Machine Description Manual AccuracyContact Info Identification Master Power Switch Basic ControlsGrinding Wheel & Coolant Controls Power Feed Controls HandwheelsMachine Data Sheet Magnetic Chuck Info Safety Safety Instructions for MachineryPage Additional Safety for Surface Grinders Power Supply AvailabilityFull-Load Current Rating Circuit Requirements forGrounding Instructions Extension CordsMinimum Gauge Size 14 AWG 50 ftSetup Needed for SetupUnpacking Description QtyInventory Small parts inventoryCleanup Before cleaning, gather the followingBasic steps for removing rust preventative Site Considerations Lifting & Placing To lift and place the machineAssembly To assemble the surface grinderCable orientation on pulley Open End Pulley Page Power Connection To connect the power supply to the machineTest Run To test run the machinePage Operations Operation OverviewWheel Selection Abrasive TypeGrit Size GradeWheel Inspection Ring Test To inspect a wheel for damageTo perform a ring test To balance the grinding wheel assembly Wheel BalancingTools Needed Qty To mount wheel assembly Mounting/Removing WheelMounting Wheel Items Needed QtyPage To remove wheel assembly Wheel DressingRemoving Wheel Power Feeds To set up the power feeds to work togetherTool Needed Qty Model G0763 Mfg. Since 8/13 Accessories Friable Surface Grinding Wheels, Aluminum OxideH5618-Parallels for Magnetic Chuck Maintenance Cleaning ProtectingSchedule DailyLubrication One-Shot OilerOil Sump Coolant System Table Ball Bearing StripsHazards To lubricate table ball bearing stripsWheel Storage Check/Adding CoolantChanging Coolant To change coolantService TroubleshootingSymptom Possible Cause Possible Solution Wiring Wiring Safety InstructionsWiring Overview Electrical Cabinet Wiring Power Feed Control Panel 220 VACControl Panel PumpElectrical panel and control panel wiring Electrical Panel & Control PanelControl Panel Wiring Control Panel Viewed from behindElectrical Cabinet Wiring Power Feed Control Panel Power feed controls wiring Model G0763 Mfg. Since 8/13Motor Wiring Diagrams Spindle Motor Wiring clockwiseCoolant Pump Motor 220V Prewired Coolant Pump Motor Rewired toParts BaseColumn 134Description Motor & Downfeed System DescriptionSaddle 405 406 402 407 404 419 403 417 409 410 412 416 418 503 505 511 507 508510 502 509 501 Accessories Electrical Cabinet Main Control Panel 715Power Feed Control Box 722 723 733 721 724Labels & Cosmetics Warranty Card CommentsGrizzly INDUSTRIAL, INC BOX BELLINGHAM, WAWarranty & Returns