IEC 947-2 TEST PROCEDURE
Standard Tests Consisting of seven parts, the IEC 947 Standard applies to all
Three documents are to be consulted for circuit breakers and switches:
•IEC
•IEC
•IEC
Two Categories of Devices
Breaking Capacity
The IEC
•Category
•Category
Ultimate Breaking | Icu is the value to be taken into account when calculating an installation. The rule remains: Icu > Icc |
Capacity: Icu | (maximum fault current of the installation). |
Breaking | This characteristic indicates the ability of the device to eliminate |
Performance During | with a greater likelihood of occurring, generally near the application. Ics is expressed in % of Icu (values |
Operation: Ics | retained by the standard IEC |
| performance, groups together on the same device, following the breaking test |
| 72), certain checks such as: |
| • Temperature rise under In |
| • Calibration at 1.45 In |
| • Leakage current (for devices suitable for disconnection) |
| The leakage current should not exceed 2 mA under the application voltage (0.5 mA when new). These |
| checks ensure that the device is able to carry out all its functions after elimination of a fault of Ics value |
| and to be put back in operation; hence the notion of breaking power performance during operation Ics. |