Makita BHR243 (LXRH02*1), BHR242 (LXRH01*1) specifications DX01, DX02

Page 25

P 25/ 25

Wiring diagram (cont.)

Fig. D-4

DX01, DX02

Connector

Connector viewed from lead wire installation side

Connect Lead wires to Connector with

Flag receptacles as drawn below.

Connector

Black lead wire

Red lead wire

White lead wire

Lead wires between Connector and Controller have to fixed with these lead wire holders. Do not slack them between the lead wire holders.

Put Lead wires between Connector and Controller into this groove.

Pass Lead wires through the holes of Line filter one by one and place them in the space between Ribs.

(Line filter is not used for some countries.)

Connect Lead wires to DC motor with

Flag receptacles as drawn below.

DC motor

Black

Lead wire DC motor

Red

Red mark

Lead wire

 

Set DC motor in place so that the red mark faces to the bottom of DX01/ DX02.

Pass Lead wires through the hole of Line filter and place them here.

(Line filter is not used for some countries.)

Put Lead wires between Connector and Controller into this groove.

Image 25
Contents Optional accessories SpecificationDX01, DX02 Standard equipmentRepair Necessary Repairing ToolsSection Transmission parts CounterweightRepair Lubrication 1A. Bit holder section for BHR242 DISASSEMBLY/ASSEMBLYDisassembling 1B. Holder section for BHR243Tool holder Leaf spring Change cover Drill chuck assembly for BHR243 DISASSEMBLY/ Assembly Change lever Hammer modeRotor See Fig Torsion spring 6 for Connector, Battery housingFigs to Torque limiter sectionImpact bolt in Torque limiter section Correct Wrong Swash bearing section, Piston cylinder section Swash bearing section DISASSEMBLY/ASSEMBLY Pressure Oil seal 25, Cup sleeve, Ball bearing 6806LLUMotor of Dust extraction system DX01, DX02 Slide levers of Dust extraction system DX01, DX02 Tips on repair of Dust extraction system DX01, DX02 Fig. D-1 Circuit diagramFig. D-3 Wiring diagramDX01, DX02