Grizzly G0756 owner manual Arbor/Chuck Assembly, Initial Lubrication

Page 18

Arbor/Chuck

Assembly

An arbor is included for the drill chuck that comes with this machine. The following procedure describes how to install the arbor in the chuck.

After the arbor is installed in the drill chuck, it is very difficult to separate the assembly. If you would like to use a different chuck in the future, we suggest using a different arbor.

Important: DO NOT install the drill chuck and arbor assembly until AFTER the test run.

To connect the drill chuck with the arbor:

1.Use acetone or lacquer thinner to clean drill chuck and arbor mating surfaces, especially the bore.

2.Retract the chuck jaws so that they are not exposed.

3.insert the arbor into the drill chuck.

4.hold assembly by the arbor and tap chuck onto a block of wood with moderate force (see Figure 8).

Figure 8. Installing arbor into chuck.

Initial Lubrication

GEARBOX MUST

BE FILLED WITH OIL!

OIL MAY NOT BE

SHIPPED WITH MACHINE!

Refer to Lubrication Section

for Correct Oil Type.

To prevent spillage, this machine was shipped from the factory without any oil in it. The head- stock oil reservoir must be properly filled with oil before the drill press can be operated for the first time. Refer to the Lubrication section, beginning on Page 33, for details on how to check and add oil.

Damage caused by running the drill press without oil in the reservoir will not be cov- ered under warranty.

-16-

Model G0756 (Mfg. Since 2/13)

Image 18
Contents Model G0756 Industrial Drill Press Page Table of Contents Introduction Machine Description Manual AccuracyContact Info Identification Control Panel Machine Data Sheet Main Specifications Operation Info Safety Safety Instructions for MachineryPage Safety for Drill Presses Full-Load Current Rating Power SupplyAvailability Circuit Requirements forMinimum Gauge Size 14 AWG Grounding InstructionsExtension Cords 50 ftUnpackingInventory SetupNeeded for Setup Inventory see Figure Qty Cleanup Before cleaning, gather the following Basic steps for removing rust preventative Site Considerations Lifting & Placing Anchoring to FloorAnchoring to Concrete Floors Arbor/Chuck Assembly Initial LubricationTo connect the drill chuck with the arbor Power Connection To connect the power cord to the machineMaster power switch Model G0756 Mfg. Since 2/13 Test RunEmergency Test Coolant System To test the coolant systemTo perform the spindle break-in procedure Spindle Break-InTooling Installation Removal OperationsOperations Overview Installing Tapered Tooling Removing Tooling with Automatic DriftRemoving Tooling Manually Raising/Lowering Table Depth StopTable Positioning Rotating TableSelecting Spindle To determine the needed RPMDrilling Mode Automatic Power Downfeed Tapping Mode Coolant System To use tapping modeTo operate the coolant system ACcESSORIES G1075-52-PC. Clamping KitG3658-Titanium Drill Bits H7616 H7617H7819-Drill & Tap HSS 24 pc. Set H8262-1⁄2 x MT#4 Keyless Chuck with Integral ShankMaintenance Cleaning ProtectingSchedule To change oil in headstock LubricationHeadstock Lubrication Oil Flow Sight GlassChanging Coolant Ball OilersSymptom Possible Cause Possible Solution ServiceTroubleshooting Motor & ElectricalDrill Press Operations Replacing Lamp Bulb Torque LimiterTo replace the bulb in the work lamp Wiring Wiring Safety InstructionsWiring Overview Component Location IndexHot 220 VAC Power Connection WiringElectric Clutch Wiring PlugMotor & Pump Wiring Spindle motor wiringViewed from behind Control Panel & Limit Switches Electrical Panel Wiring QM5 QM3 QM2 QM1Electrical Wiring Panel Photo Electrical wiring panel Model G0756 Mfg. Since 2/13Parts Table Support & Coolant BreakdownTable Support & Coolant Parts List DescriptionGearbox Breakdown Gearbox Breakdown Gearbox Parts List Spindle Feed Breakdown Spindle Feed Parts List Headstock Breakdown Headstock Breakdown Headstock Parts List Electrical Parts Breakdown Electrical Parts List DescriptionLabels & Cosmetics 506 502 503 501 508 509 507 510 504 511 505 512 513Warranty Card CommentsGrizzly INDUSTRIAL, INC BOX BELLINGHAM, WAWarranty & Returns