Installing the Console | 33 |
Completing the Console Installation (P30 and P20)
Before you complete the final installation steps,
To complete the installation:
1.Feed extra cable back into the neck tube.
2.Tilt the control console backward (toward yourself) until the tab on the top edge of its back plate slides along the top edge of the console mount and the screw holes align properly.
3.Insert the four
4.Line up the two small tabs at the bottom of the console’s back cover with the slots at the bottom of the console case. Insert the tabs into the slots.
5.Insert the two
Important: Use caution not to pinch the cables between the back cover and PVS mounting screw heads.
6.Fully tighten the four mounting screws (partially tightened in step 3) using a
Verifying That the Heart Rate Display Is Operational
To verify that the heart rate display is operational:
1.Begin exercising on the equipment.
2.Grasp both
Note: The heart rate is read within ten seconds. During that time, the heart on the display flashes.
3.Look at the HEART RATE display. After a few seconds, a number appears indicating your heart rate.
4.If a number does not appear in the HEART RATE display, check the cable connection to make sure it is properly connected.