Sharp CV-P10LJ, CV-P13LJ operation manual E-24, Technical Specifications

Page 25
Technical Specifications

Technical Specifications

Sr

 

Parameter

Unit

Value

No

 

 

 

 

 

1

Model

 

 

CV-P10LJ

 

 

 

 

 

 

Power

Rated Voltage

V

220-240

2

Rated Frequency

Hz

50

Supply

 

 

 

 

 

Phases

 

1

 

 

 

3

Cooling Capacity

W

2930

 

 

 

 

4

Cooling Power Input

W

1100

 

 

 

 

5

Cooling Power Current

A

4.80

 

 

 

 

 

6

Rated Input

 

W

1250

 

 

 

 

 

7

Rated Current

 

A

5.80

 

 

 

 

8

Air Flow Volume(H/M/L)

m3/h

350/260/180

9

Dehumidifying Volume

L/h

1

 

 

 

 

 

10

EER

 

W/W

2.66

 

 

 

 

11

Application Area

m2

14~20

12

Climate Type

 

 

T1

 

 

 

 

 

13

Isolation

 

 

I

 

 

 

 

14

Moisture Protection

 

IP24

 

 

 

 

15

Permissible Excessive Operating Pressure

MPa

3.8

for the Discharge Side

 

 

 

 

 

 

 

16

Permissible Excessive Operating Pressure

MPa

1

for the Suction Side

 

 

 

17

Throttling Method

 

Capillary

 

 

 

 

 

18

Fuse

 

A

3.15

 

 

 

 

19

Operation Temp

16ºC30ºC

 

 

 

 

20

Ambient Temp (Cooling)

10ºC35ºC

 

 

 

 

21

Sound Pressure Level (H/M/L)

dB (A)

56/54/52

 

 

 

 

22

Sound Power Level (H/M/L)

dB (A)

66/65/62

 

 

 

 

23

Dimension (WXHXD)

mm

500×830×450

 

 

 

 

24

Dimension of Carton Box (L/W/H)

mm

578x532x862

 

 

 

 

25

Dimension of Package (L/W/H)

mm

581x535x877

 

 

 

 

 

26

Net Weight

 

kg

41

 

 

 

 

 

27

Gross Weight

 

kg

48

 

 

 

 

 

E-24

Image 25
Contents PORTABLE TYPE ROOM AIR CONDITIONER CV-P10LJ CV-P13LJEN GLI SH ES PA ÑO L CONTENTS NOTES ON OPERATION USAGE CAUTIONSLOCATION PRECAUTIONSKeep the filter clean Turn off the air conditioner when no one is homeINCLUDED SUGGESTED TOOLS FOR WINDOW PANEL INSTALLATION3. Knife or scissors FRONT VIEW REAR VIEW PART NAMES33 Horizontal louvers 44 POWER Button 55 Remote control signal receiver windowREMOTE CONTROL DISPLAY REMOTE CONTROL1 1 Transmitter 2 Display 3 POWER Button 79 ON TIMER ButtonInstallation in a double-hungsash window INSTALL WINDOW PANELFoam seal A adhesive type Bracket Adjustment panel 24~36.8 Extension panel 36.8~48INSTALL WINDOW PANEL Installation in a sliding sash windowE-10 Installation of the exhaust hose INSTALLATION AND REMOVAL OF EXHAUST HOSEE-11 Unacceptable Acceptable AcceptableE-12 Removal of the exhaust hosePUSH Projection E-13 PRE-OPERATIONCHECKSLOADING BATTERIES Use two AAA R03 batteries E-14 HOW TO USE THE REMOTE CONTROLDEHUMIDIFICATION MODE COOL MODEE-15 2 Press the POWER button to start opera- tionTO TURN OFF Press the POWER button again E-16TO TURN OFF Press the POWER button again Press the POWER button to start operationUP / DOWN AIR FLOW DIRECTION TO CHANGE AIR FLOW DIRECTIONLEFT / RIGHT AIR FLOW DIRECTION E-17E-18 PLASMACLUSTER OPERATIONTO CANCEL Press the PLASMACLUSTER button duringSLEEP OPERATION MEGA COOL OPERATIONE-19 TO CANCELON TIMER TIMER OPERATIONOFF TIMER E-20DRAINAGE MAIN UNIT OPERATIONE-21 Press the POWER button on the unitCLEANING THE FILTER MAINTENANCECLEANING THE UNIT AND THE REMOTE CONTROL MAINTENANCE AFTER AIR CONDITIONER SEASONE-23 BEFORE CALLING FOR SERVICETIMER DOES NOT WORK PROPERLY AIR CONDITIONER DOES NOT OPERATE AT ALLTechnical Specifications E-24Compressor E-25Evaporator CondenserTechnical Specifications E-26Compressor E-27Evaporator CondenserConsumer Electronic Products WARRANTYCongratulations on Your Purchase DO NOT RETURN THIS DOCUMENT TO SHARPSHARP APPROVED SERVICE CENTRE SHARP APPROVED SERVICE CENTRESHARP CUSTOMER SERVICES 1300Page 66129905937