Sharp CV-P13LJ, CV-P10LJ Pre-Operationchecks, E-13, LOADING BATTERIES Use two AAA R03 batteries

Page 14
PRE-OPERATION CHECKS

PRE-OPERATION CHECKS

LOADING BATTERIES Use two AAA (R03) batteries.

1 Remove the battery cover at the back of the remote control.

2 Insert batteries into the com- partment, making sure the ± and Ñ polarities are correctly aligned.

Lines will appear on the display when batteries are properly in- stalled.

3 Reattach the battery cover.

4 Press the RESET button using a thin pointed implement.

Battery cover

NOTES:

The battery should last approximately one year under normal use.

When replacing the batteries, always change both batteries at the same time, and make sure they are the same type.

If the remote control does not operate normally after replacing the batteries, press the RESET button using a thin pointed implement.

If you will not be using the unit for a prolonged period, remove the batteries from the remote control.

E-13

Image 14
Contents EN GLI SH ES PA ÑO L CV-P10LJ CV-P13LJPORTABLE TYPE ROOM AIR CONDITIONER CONTENTS USAGE CAUTIONS NOTES ON OPERATIONKeep the filter clean PRECAUTIONSLOCATION Turn off the air conditioner when no one is home3. Knife or scissors SUGGESTED TOOLS FOR WINDOW PANEL INSTALLATIONINCLUDED 33 Horizontal louvers 44 POWER Button PART NAMESFRONT VIEW REAR VIEW 55 Remote control signal receiver window1 1 Transmitter 2 Display 3 POWER Button REMOTE CONTROLREMOTE CONTROL DISPLAY 79 ON TIMER ButtonINSTALL WINDOW PANEL Installation in a double-hungsash windowAdjustment panel 24~36.8 Extension panel 36.8~48 Foam seal A adhesive type BracketInstallation in a sliding sash window INSTALL WINDOW PANELE-10 E-11 INSTALLATION AND REMOVAL OF EXHAUST HOSEInstallation of the exhaust hose Unacceptable Acceptable AcceptablePUSH Projection Removal of the exhaust hoseE-12 LOADING BATTERIES Use two AAA R03 batteries PRE-OPERATIONCHECKSE-13 HOW TO USE THE REMOTE CONTROL E-14E-15 COOL MODEDEHUMIDIFICATION MODE 2 Press the POWER button to start opera- tionTO TURN OFF Press the POWER button again E-16TO TURN OFF Press the POWER button again Press the POWER button to start operationLEFT / RIGHT AIR FLOW DIRECTION TO CHANGE AIR FLOW DIRECTIONUP / DOWN AIR FLOW DIRECTION E-17TO CANCEL PLASMACLUSTER OPERATIONE-18 Press the PLASMACLUSTER button duringE-19 MEGA COOL OPERATIONSLEEP OPERATION TO CANCELOFF TIMER TIMER OPERATIONON TIMER E-20E-21 MAIN UNIT OPERATIONDRAINAGE Press the POWER button on the unitCLEANING THE UNIT AND THE REMOTE CONTROL MAINTENANCECLEANING THE FILTER MAINTENANCE AFTER AIR CONDITIONER SEASONTIMER DOES NOT WORK PROPERLY BEFORE CALLING FOR SERVICEE-23 AIR CONDITIONER DOES NOT OPERATE AT ALLE-24 Technical SpecificationsEvaporator E-25Compressor CondenserE-26 Technical SpecificationsEvaporator E-27Compressor CondenserCongratulations on Your Purchase WARRANTYConsumer Electronic Products DO NOT RETURN THIS DOCUMENT TO SHARPSHARP CUSTOMER SERVICES SHARP APPROVED SERVICE CENTRESHARP APPROVED SERVICE CENTRE 1300Page 66129905937