FORMULA:

 

(tons of cooling) x (400 CFM per ton) (144 square inches per foot)

= filter area sq.inches

(max. air velocity of filter from table 3 for the filter type)

= length x width of

 

filter in inches

EXAMPLE: If you had a CHX3-100 furnace and 4 tons of cooling and a standard permanent filter.

4 tons x 400 CFM x 144 = 460 square inches for cooling 500

For heating a CHX3-100 needs 394 square inches of filter. The filter system must be designed for the larger CFM requirement determined for cooling of 460 square inches. A filter would have to be sized so that the area (length X width) was at least 460 sq. in.

L. WIRING

All wiring shall be performed by a qualified electrician or service person. The wiring must comply with local codes, the instructions in this manual, and in the absence of codes with the National Electrical Code (ANSI/NFPA-70 or latest edition).

1. The following items are guidelines to complete the wiring portion of the installations.

a.A separate power supply circuit with over current protection and a disconnect switch must be provided. The minimum fuse or circuit breaker size is 20 amp.

b.All CHX3 and CDX3 Series furnaces are supplied with a fuse disconnect switch box to be mounted on the outside surface of the right or left side casing so a fuse disconnect can be mounted on the furnace. Make the 115 volt supply connection in this junction box. A green screw and a strain relief are provided in order to connect the power supply ground wire and provide strain relief for the 115 volt power leads from the furnace in the fuse disconnect box. A disconnect switch can be field mounted on the 2x4 box provided. If not, the disconnect switch must be located reasonably close to and within sight of the furnace.

NOTICE: The hot surface igniter and operation of this furnace depends on correct polarity. The hot leg of the supply circuit must be connected to the black line lead and the common leg to the white line lead in the field mounted junction box. The hot leg must pass through the disconnect switch in all cases to prevent the hazard of electrical shock when servicing.

IMPORTANT: The furnace must be grounded in accordance with local codes and with the National Electrical Code (ANSI/NFPA NO. 70 or latest edition) when an external electrical source is utilized.

2. ELECTRONIC AIR CLEANER (EAC) AND HUMIDIFIER INSTALLATION

The ignition module on this furnace has designated terminals to control the operation of an electronic air cleaner and/or humidifier. These terminals provide line voltage (110-20VAC) for the control of these accessories. (See Figure 21). NOTICE: It is important to confirm that the operating voltage of the humidifier or EAC being installed matches the output of this control. If not, a field supplied relay or transformer may be necessary to provide the proper control and supply voltage for the accessory being installed. See the manufacturers instructions for the humidifier or EAC for additional instructions.

32

Image 38
Contents CHX3-125N CDX3-125N MODELS FOR USE WITH NATURAL GAS OR LP GAS PROPANECHX3-75N CDX3-75N CHX3-100N CDX3-100N INSTALLATION AND OPERATION MANUALI. SAFETY INFORMATION This and the previous page contain reproductions of the various warning and instruction labels placed on the Thermo Pride Two Stage Condensing Gas Furnaces. Please read and comply with the contents of these labels 1.A windows be opened The CHX3/CDX3 furnace models are sealed combustion design, which does not require an air shutter adjustment air shutters are not used for proper flame characteristics. Burner box access cover must always be secured with all screws in place and tightened before operating furnace BEGINNING PAGE INDEXSECTION II. FURNACE SPECIFICATIONS CDX3 SERIES INSTALLATION PARTS PACKAGES – CHX3-75 INSTALLATION PARTS PACKAGES – CDX3-75 Grounding instructions III. GENERAL INSTALLATION B. FURNACE LOCATION B1. CDX3 HORIZONTAL APPLICATIONFigure PVC Pipe Designation Maximum Quantity of Elbows E.Direct Venting Through a Sidewall Outside Combustion Air Intake RH viewc.The vent terminal shall not be located •near soffit vents, crawl space vents, or other areas where condensate or water vapor could create a nuisance, hazard, or cause property damage, and Page E1. Single-PipeSidewall Venting Option 5.Optional Direct Vent Terminations Install these optional kits according to the instructions provided with each kit. The location and clearance requirements are identical to those of the standard vent terminations described in this manual 1.Figures 6B, 7, and 8 follow depicting typical exhaust vent and air intake connections for the furnace model series CHX3 and the CDX3, respectively, as well as a list of required parts to correctly install each system Applications Applications leading away from the furnace must be composed of 3-inchdiameter PVC pipe and pipe fittings only. Refer to item E in Figure 3. Connecting The Combustion Air Intake Piping I.CONDENSATE DRAIN LINE AND TRAP ASSEMBLY Figure 14. TRAP ASSEMBLY MOUNTED ON CHX3Figure 15. TRAP ASSEMBLY MOUNTED ON CDX3 2.Determine on which side of furnace the condensate disposal line is to be run NOTICE: On CHX3/CDX3’s this must be the same side as the flue outlet or bottom of unit. Attach the condensate trap to the furnace casing using the #8x3/4” sheet metal screws provided in the parts package. Pilot holes are provided on both sides of the casing for mounting J. GENERAL GAS PIPING J1. REQUIREMENTS AND SIZING OF DUCT WORK Figure 18A TABLE 2A 2. CDX3 MODELS: COUNTERFLOWS K. FILTERS 1. CHX3 MODELS: HIGHBOYSFigure Figure L. WIRING Table 4A Options S7 DIP SwitchSwitch Settings Time2-StageBlower Settings from factory Table 4C IV. STARTING THE UNIT A. SEQUENCE OF OPERATIONS FLAME MUST BE DETECTED IF THERMOSTAT W2 CONTACTS ARE CLOSED OTHERWISE B. INITIAL START UP OPERATING INSTRUCTIONSA.Burner manifold pressure with a pressure gauge C. Measuring And Adjusting Heat Input RateObserve the following precautions when measuring B.Gas flowrate by clocking gas meterNOTICE: A U-tubemanometer, measuring pressure in inches of water column, is recommended for all gas pressure measurements. However, an aneroid pressure gauge, in good working condition, capable of reading pressure changes of 0.05 in. W.G., or less, that was recently calibrated within the last year, is a satisfactory alternate. These two 2 devices will be considered as equivalent and interchangeable. Either device is referred to below as a “pressure gauge” Heat input rate in BTUH = Figure 21.Go to Checkout Procedure below Checking The Burner FlameCheckout Procedure TABLE 6 - CONVERTING GAS FLOW RATE D. FURNACE CHECKOUT PROCEDURE V. INSTALLERS INSTRUCTIONS TO USERFigure VI. TROUBLESHOOTING DIAGNOSTIC FEATURES Power must be disconnected before servicingTROUBLESHOOTING GUIDE IS INDUCER RUNNING ON LOW SPEED? YES DOES THE HOT DO BURNERS STAY LIT PAST PROOF OF FLAME CHECK? REPLACE THE 50V51-843CONTROL CHECK FOR 24 VOLTS Appendix –AReplacement Parts List Page Page Page Appendix – B Wiring Diagrams