York DM090 Operation, Additional Static Resistance, Motor Sheave Datum Diameters, Cfm

Page 33

035-17311-003-A-0704

TABLE 30: ADDITIONAL STATIC RESISTANCE

CFM

Cooling Only*

Economizer† ‡

 

Electric Heat KW

 

9

18

24

36

54

 

 

 

 

 

 

 

 

 

 

 

2300

0.08

0.02

0.07

0.08

0.09

0.10

0.13

2500

0.09

0.02

0.08

0.09

0.10

0.11

0.14

2700

0.11

0.03

0.09

0.10

0.12

0.13

0.16

2900

0.12

0.03

0.10

0.11

0.13

0.14

0.18

3100

0.14

0.03

0.12

0.13

0.15

0.16

0.20

3300

0.16

0.03

0.13

0.14

0.17

0.18

0.22

3500

0.18

0.04

0.15

0.16

0.19

0.20

0.24

3700

0.20

0.04

0.17

0.18

0.21

0.22

0.26

3900

0.23

0.04

0.19

0.20

0.23

0.24

0.28

4100

0.25

0.04

0.21

0.22

0.25

0.26

0.31

4300

0.28

0.05

0.23

0.24

0.28

0.29

0.34

4500

0.30

0.05

0.25

0.26

0.30

0.31

0.37

4700

0.33

0.05

0.28

0.29

0.33

0.34

0.40

4900

0.36

0.05

0.30

0.31

0.35

0.37

0.43

5100

0.39

0.06

0.33

0.34

0.38

0.40

0.46

5300

0.42

0.06

0.35

0.37

0.41

0.43

0.49

5500

0.45

0.06

0.38

0.40

0.44

0.46

0.53

5700

0.48

0.06

0.41

0.43

0.47

0.49

0.56

5900

0.52

0.07

0.44

0.46

0.50

0.53

0.59

6100

0.56

0.07

0.47

0.49

0.53

0.56

0.62

6300

0.60

0.07

0.50

0.53

0.56

0.59

0.65

*. Add these resistance values to the available static resistance in the respective Blower Performance Tables.

†.Deduct these resistance values from the available external static pressure shown in the respective Blower Performance Table.

‡.The pressure drop through the economizer is greater for 100% outdoor air than for 100% return air. If the resistance of the return air duct system is less than 0.25 IWG, the unit will deliver less CFM during full economizer operation.

TABLE 31: MOTOR SHEAVE DATUM DIAMETERS

 

1VM50x7/8

1VP56x1-1/8

(1-1/2, 2 & 3 HP Motor)

(5 HP Motor)

 

 

 

 

 

Turns Open

Datum

Turns Open

Datum

Diameter

Diameter

 

 

 

 

 

 

 

 

0

 

4.4

1

5.3

 

 

 

 

 

1/2

 

4.3

1-1/2

5.2

 

 

 

 

 

1

 

4.2

2

5.1

 

 

 

 

 

1-1/2

 

4.1

2-1/2

5.0

 

 

 

 

 

2

 

4.0

3

4.9

 

 

 

 

 

2-1/2

 

3.9

3-1/2

4.8

 

 

 

 

 

3

 

3.8

4

4.7

 

 

 

 

 

3-1/2

 

3.7

4-1/2

4.6

 

 

 

 

 

4

 

3.6

5

4.5

 

 

 

 

 

4-1/2

 

3.5

5-1/2

4.4

 

 

 

 

 

5

 

3.4

6

4.3

 

 

 

 

 

OPERATION

SEQUENCE OF OPERATIONS OVERVIEW

For the Predator® series of units, the thermostat makes a cir- cuit between "R" and "Y1" for the first stage of cooling.

The call is passed to the Unit Control Board (UCB), which then determines whether the requested operation is available and, if so, which components to energize.

When the "W1" call is sensed, the indoor air blower is ener- gized following a specified heating delay.

If at any time a call for both heating and cooling are present, the heating operation will be performed. If operating, the cool- ing system is halted as with a completion of a call for cooling. Heating always takes priority.

Unitary Products Group

33

Image 33
Contents Installation Manual Table of Contents List of Figures List of Tables General Safety ConsiderationsInspection ReferenceNomenclature ½ 12½ Ton Predator Model Number NomenclatureNOMENCLATURE, Additonal Options Johnson UNT Controller, DFS, APS & Phase Monitor Technicoat Condenser Coil, Phase Monitor, & Coil Guard Installation Installation Safety InformationPreceding Installation Unit Temperature Limitations LocationRigging and Handling Length of Forks Must be a Minimum of 60 Inches Point Load WeightDetail C Detail B Detail aBottom Duct Openings from Above Duct Covers DuctworkSide Panels with Hole Plugs Condensate Drain Control Wire Sizes Thermostat WiringPower and Control Wiring Power Wiring DetailElectronic Thermostat Field Wiring RLA 380 11.5 75.0 Electrical Data DM120 10 TON with Power Convenience OutletOPTIONS/ACCESSORIES Physical DataMinimum Supply AIR CFM Adjustments and Information Economizer and Power Exhaust SET PointEnthalpy SET Point Chart Blower Rotation PhasingSupply AIR Limitations Belt Tension1/2 TON Optional Motor Down Shot Blower PERFORMANCE* † 1/2 TON Standard Motor Down Shot Blower PERFORMANCE* †10 TON Optional Motor Down Shot Blower PERFORMANCE* † 10 TON Standard Motor Down Shot Blower PERFORMANCE* †12-1/2 TON Optional Motor Down Shot Blower PERFORMANCE* † 12-1/2 TON Standard Motor Down Shot Blower PERFORMANCE* †1/2 TON Optional Motor Side Shot Blower PERFORMANCE* † 1/2 TON Standard Motor Side Shot Blower PERFORMANCE* †10 TON Standard Motor Down Shot Blower PERFORMANCE* † 12-1/2 TON Optional Motor Side Shot Blower PERFORMANCE* † 12-1/2 TON Standard Motor Side Shot Blower PERFORMANCE* †AIR Balance Indoor Blower SpecificationsChecking AIR Quantity Method ONE Method TWODRY Coil Delta P Supply AIR Drive Adjustment Additional Static Resistance OperationMotor Sheave Datum Diameters Sequence of Operations OverviewCooling Sequence of Operation Compressor Protection Safety ControlsElectric Heat Limit Setting Electric Heating Operation ErrorsElectric Heating Sequence of Operations Electric Heat Antictpator SetpointsCharging the Unit START-UP Cooling12.5 TON Standard Efficiency Superheat Charging 10 TON Standard Efficiency Superheat ChargingNormal Maintenance Troubleshooting GeneralPredator Flash Codes Unit Control Board Flash Codes Basic Troubleshooting FlowchartCooling Troubleshooting Guide Unitary Products Group 035-17311-003-A-0704 Unitary 5005 Norman Products York Group Drive 73069