York DM090 installation manual START-UP Cooling, Charging the Unit

Page 37

035-17311-003-A-0704

START-UP (COOLING)

PRESTART CHECK LIST

After installation has been completed:

1.Check the electrical supply voltage being supplied. Be sure that it is the same as listed on the unit nameplate.

2.Set the room thermostat to the off position.

3.Turn unit electrical power on.

4.Set the room thermostat fan switch to on.

5.Check indoor blower rotation.

If blower rotation is in the wrong direction. Refer to Phasing Section in general information section.

Check blower drive belt tension.

6.Check the unit supply air (CFM).

7.Measure evaporator fan motor's amp draw.

8.Set the room thermostat fan switch to off.

9.Turn unit electrical power off.

OPERATING INSTRUCTIONS

1.Turn unit electrical power on.

NOTE: Prior to each cooling season, the crankcase heaters must be energized at least 10 hours before the sys- tem is put into operation.

2.Set the room thermostat setting to lower than the room temperature.

3.First stage compressors will energize after the built-in time delay (five minutes).

4.The second stage of the thermostat will energize second stage compressor if needed.

POST START CHECK LIST

1.Verify proper system pressures for both circuits.

2.Measure the temperature drop across the evaporator coil.

CHARGING THE UNIT

These units should be charged using the superheat method. Super heat charging data is shown in Tables 34 thru 36.

When charging each system, superheat data should be taken at the compressor inlet.

TABLE 34: 7.5 TON STANDARD EFFICIENCY SUPERHEAT CHARGING

 

 

 

 

 

Superheat at Compressor Suction (°F)

 

 

 

 

Outdoor

 

 

 

 

 

Airflow = 3000 CFM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temp (°F)

 

 

 

 

 

Indoor WB Temp (°F)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

55

57

59

61

 

63

65

67

 

69

71

73

75

 

 

 

 

 

 

 

 

 

 

 

 

 

 

65

10.6

13.5

16.3

19.1

 

22.0

24.8

27.7

 

29.1

30.5

32.0

33.4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

70

8.4

11.1

13.8

16.5

 

19.3

22.0

24.7

 

26.5

28.4

30.2

32.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

75

6.1

8.7

11.3

13.9

 

16.6

19.2

21.8

 

24.0

26.2

28.4

30.6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

80

-

6.4

8.9

11.4

 

13.9

16.3

18.8

 

21.4

24.0

26.6

29.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

85

-

-

6.4

8.8

 

11.1

13.5

15.9

 

18.9

21.9

24.8

27.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90

-

-

5.8

7.9

 

10.1

12.2

14.3

 

17.2

20.2

23.1

26.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

95

-

-

5.3

7.1

 

9.0

10.8

12.7

 

15.6

18.5

21.5

24.4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

100

-

-

-

6.3

 

7.7

9.0

10.4

 

13.5

16.6

19.7

22.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

105

-

-

-

5.5

 

6.4

7.3

8.1

 

11.4

14.6

17.9

21.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

110

-

-

-

-

 

5.1

5.5

5.9

 

9.3

12.7

16.1

19.5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

115

-

-

-

-

 

-

-

-

 

7.2

10.8

14.3

17.9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unitary Products Group

37

Image 37
Contents Installation Manual Table of Contents List of Figures List of Tables General Safety ConsiderationsInspection ReferenceNomenclature ½ 12½ Ton Predator Model Number NomenclatureNOMENCLATURE, Additonal Options Johnson UNT Controller, DFS, APS & Phase Monitor Technicoat Condenser Coil, Phase Monitor, & Coil Guard Installation Safety Information InstallationPreceding Installation Location Unit Temperature LimitationsRigging and Handling Length of Forks Must be a Minimum of 60 Inches Point Load WeightDetail C Detail B Detail aBottom Duct Openings from Above Duct Covers DuctworkSide Panels with Hole Plugs Condensate Drain Control Wire Sizes Thermostat WiringPower and Control Wiring Power Wiring DetailElectronic Thermostat Field Wiring RLA 380 11.5 75.0 Electrical Data DM120 10 TON with Power Convenience OutletPhysical Data OPTIONS/ACCESSORIESMinimum Supply AIR CFM Adjustments and Information Economizer and Power Exhaust SET PointEnthalpy SET Point Chart Blower Rotation PhasingSupply AIR Limitations Belt Tension1/2 TON Optional Motor Down Shot Blower PERFORMANCE* † 1/2 TON Standard Motor Down Shot Blower PERFORMANCE* †10 TON Optional Motor Down Shot Blower PERFORMANCE* † 10 TON Standard Motor Down Shot Blower PERFORMANCE* †12-1/2 TON Optional Motor Down Shot Blower PERFORMANCE* † 12-1/2 TON Standard Motor Down Shot Blower PERFORMANCE* †1/2 TON Optional Motor Side Shot Blower PERFORMANCE* † 1/2 TON Standard Motor Side Shot Blower PERFORMANCE* †10 TON Standard Motor Down Shot Blower PERFORMANCE* † 12-1/2 TON Optional Motor Side Shot Blower PERFORMANCE* † 12-1/2 TON Standard Motor Side Shot Blower PERFORMANCE* †AIR Balance Indoor Blower SpecificationsChecking AIR Quantity Method ONE Method TWODRY Coil Delta P Supply AIR Drive Adjustment Additional Static Resistance OperationMotor Sheave Datum Diameters Sequence of Operations OverviewCooling Sequence of Operation Compressor Protection Safety ControlsElectric Heat Limit Setting Electric Heating Operation ErrorsElectric Heating Sequence of Operations Electric Heat Antictpator SetpointsCharging the Unit START-UP Cooling12.5 TON Standard Efficiency Superheat Charging 10 TON Standard Efficiency Superheat ChargingGeneral Normal Maintenance TroubleshootingPredator Flash Codes Unit Control Board Flash Codes Basic Troubleshooting FlowchartCooling Troubleshooting Guide Unitary Products Group 035-17311-003-A-0704 Unitary 5005 Norman Products York Group Drive 73069