Roberts Gorden BH-115 Tube Layout Overview, Elbow Package Configuration .2.1 Elbow Installation

Page 34

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

FIGURE 20: U-Tube Layout Overview (Continued)

 

bc

 

 

 

g

d

e

e

 

h

 

 

 

 

 

60' (18.3 m) Tube Length

 

 

 

bc

 

 

 

g

d

e

e

f

h

 

 

 

 

 

70' (21.3 m) Tube Length**

 

 

 

bc

 

 

 

g

d

e

e

e

h

 

 

 

 

 

80' (24.4 m) Tube Length

 

 

7.2Elbow Package Configuration Step 7.2.1 Elbow Installation

 

Tube

 

 

 

 

 

 

Minimum Distance Required

 

Coupling

 

Between Burner and Elbow

 

 

 

Model

Minimum

 

 

 

Distance

 

 

 

 

 

 

 

BH-40

10' (3 m)

 

 

 

BH-60

10' (3 m)

Description

Part Number

90° Elbow

BH-80

10' (3 m)

BH-100

15' (4.5 m)

Elbow Package

02718702

 

 

BH-115

15' (4.5 m)

90° Elbow

01335801

 

 

BH-125

15' (4.5 m)

Coupling

01312700

 

 

BH-140

15' (4.5 m)

Reflector End Cap

02750800

 

 

BH-150

15' (4.5 m)

Reflector Joint Piece

02750900

 

 

BH-175

15' (4.5 m)

U-Clip Package

91107720

 

 

BH-200

15' (4.5 m)

 

 

 

28 of 59

 

 

 

 

Image 34
Contents Property damage. Read the Installation, Operation Improper installation, adjustment, alteration, serviceOr maintenance can result in death, injury or Installation must be done by a contractor qualifiedPage Roberts-Gordon LLC Page Table of Figures Page Safety Labels and Their Placement Heater SafetyManpower Requirements California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Wall Tag Installer ResponsibilityNational Standards and Applicable Codes Maintain clearances to combustibles at all times for safety Clearances are the required distances thatCentimeters InchesC D Model45 Tilt Reflector Model Tube, Standard Reflector ModelTube, Opposite 45 Reflector Model Inches CentimetersVenting Inches Centimeters ModelNational Standards and Applicable Codes Burner Tube Major ComponentsStainless Steel Reflector End CapContents of BH-Series Burner Carton Standard Parts ListContents of Core and Extension Packages Core Packages Minimum Standard Aluminized BH-Series Component Package Guide Model Tubing LengthHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Linear Heater Layout OverviewOpen Tube Clamp Package InstallationCoupling and Tube Assembly Closed1 Coupling and Tube Assembly 2 Coupling and Tube AssemblyTurbulator Installation Not required on the BH-125/150/175/200Hanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Tube, StandardTube, Opposite Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation Tube Layout Overview2 Elbow Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector InstallationDescription Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a Extension2 Grille End Cap Installation 3 Grille InstallationUnited States Requirements VentingCanadian Requirements Vertical Venting Unvented OperationHorizontal Venting Unvented Operation Tube TerminationCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeOutside Wall Common Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyVertical Outside Air Supply for Double Heater Installation Horizontal Outside Air Supply for Double Heater InstallationGAS Piping Hold gas nipple securely with pipe wrench When attaching gas hoseCorrect Positions Failure to follow these instructions can resultWiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the Burner Sequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterObjects Vicinity of the HeaterVehicles and Other ReflectorMotor Burner Cup and Orifice Safety LabelsBlower Scroll, Wheel ElectrodeTroubleshooting Troubleshooting Flow Chart YESPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionPage ROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 6.75 Kb Manual 20 pages 37.5 Kb