Roberts Gorden BH-175, BH-60 Operation and Maintenance, Sequence of Operation, To Shut Off Heater

Page 53

SECTION 11: OPERATION AND MAINTENANCE

SECTION 11: OPERATION AND MAINTENANCE

DANGER

 

WARNING

 

Electrical Shock Hazard

Explosion Hazard

Burn Hazard

Cut/Pinch Hazard

Disconnect electric

Turn off gas supply to

Allow heater to cool

Wear protective gear

heater before service.

before service.

during installation,

before service.

 

 

operation and service.

Heater must be

 

Tubing may still be hot

 

 

connected to a properly

 

after operation.

Edges are sharp.

grounded electrical

 

 

 

source.

 

 

 

Failure to follow these instructions can result in death, electric shock, injury or property damage.

This heater is equipped with a direct spark ignition

8. When thermostat is satisfied, all power to the

system.

unit is shut off.

11.1 Sequence of Operation

1.Turn the thermostat up. When the thermostat calls for heat, the blower motor will energize.

2.When the motor approaches nominal running RPM, the pressure switch closes and activates the ignition module.

3.After a 45 second prepurge, the ignition module then opens the gas valve and energizes the spark igniter.

4.When the flame is established, the sparking sequence ceases.

5.If the flame is not established during the ignition sequence, the ignition module closes the gas valve and purge begins. Module will try 2 additional times for ignition (with purges in between trials). If ignition is not established, the module will lockout.

6.If the flame extinguishes during operation, the ignition module will attempt the multiple trial sequence described in step 5. If ignition is not re-established, the module will lockout for one hour or until reset.

7.After lockout, the control can be reset by turning down thermostat for five seconds, and then raising it again to desired temperature, or by disconnecting power and then reconnecting.

11.2 To Shut Off Heater

Set thermostat to lowest setting. Turn OFF electric power to heater.

Turn OFF manual gas valve in the heater supply line.

11.3 To Start Heater

Turn gas valve and electric power OFF and wait five minutes for unburned gases to vent from heater. Turn ON main gas valve.

Turn ON electric power.

Set thermostat to desired temperature. Burner should light automatically.

11.4Pre-Season Maintenance and Annual Inspection

To ensure your safety and years of trouble-free operation of the heating system, service and annual inspections must be done by a contractor qualified in the installation and service of gas-fired heating equipment.

Turn off gas and electric supplies before performing service or maintenance. Allow heater to cool before servicing.

Before every heating season, a contractor qualified in the installation and service of gas-fired heating equipment must perform a thorough safety inspection of the heater.

For best performance, the gas, electrical, thermostat connections, tubing, venting, suspensions and

47 of 59

Image 53
Contents Or maintenance can result in death, injury or Improper installation, adjustment, alteration, serviceProperty damage. Read the Installation, Operation Installation must be done by a contractor qualifiedPage Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetySafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement National Standards and Applicable Codes Installer ResponsibilityWall Tag Clearances are the required distances that Maintain clearances to combustibles at all times for safetyC D InchesCentimeters ModelTube, Standard Reflector Model 45 Tilt Reflector ModelInches Centimeters Tube, Opposite 45 Reflector ModelCentimeters Model Venting InchesNational Standards and Applicable Codes Stainless Steel Major ComponentsBurner Tube Reflector End CapContents of Core and Extension Packages Standard Parts ListContents of BH-Series Burner Carton BH-Series Component Package Guide Model Tubing Length Core Packages Minimum Standard AluminizedHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Linear Heater Layout Overview Burner Tube InstallationCoupling and Tube Assembly Tube Clamp Package InstallationOpen Closed2 Coupling and Tube Assembly 1 Coupling and Tube AssemblyNot required on the BH-125/150/175/200 Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube, Opposite Tube, StandardTube Tube Heater Layout Overview Tube Layout Overview Elbow Package Configuration .2.1 Elbow Installation2 Elbow Installation Reflector Joint Detail 5 Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket InstallationDescription Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield Installation3 Grille Installation 2 Grille End Cap InstallationCanadian Requirements VentingUnited States Requirements Horizontal Venting Unvented OperationVertical Venting Unvented Operation Tube TerminationOutside Wall Vertical Ventilation 4 10 cm PipeCommon Side Wall Venting Common Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationHorizontal Outside Air Supply for Double Heater Installation Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions When attaching gas hoseHold gas nipple securely with pipe wrench Failure to follow these instructions can resultLine Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Ladder Diagram Electrical Connection to the Burner Pre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterVehicles and Other Vicinity of the HeaterObjects ReflectorBlower Scroll, Wheel Safety LabelsMotor Burner Cup and Orifice ElectrodeTroubleshooting YES Troubleshooting Flow ChartPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionPage ROBERTS-GORDON LLC will PAY for Warranty is Void ifROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 6.75 Kb Manual 20 pages 37.5 Kb