Roberts Gorden BH-100 Tube Clamp Package Installation, Coupling and Tube Assembly, Open, Closed

Page 25

SECTION 6: HEATER INSTALLATION

Step 6.2 Tube Clamp Package Installation

 

Tube Clamp

Bolt

 

 

 

Flat

 

 

Washer

 

 

Nut

 

 

(Torque 120 in/lb

 

 

13.56 Nm)

 

Description

Part Number

 

Tube Clamp Package

01318901

 

Tube Clamp

01396801

 

Bolt

97113940

 

Flat Washer

95211600

 

Nut

92113900

 

Step 6.3 Coupling and Tube Assembly

 

Close coupling

Start slide bar/coupling lock

A with tab.

B onto coupling.

 

Tab

 

 

 

Slide Bar/Coupling Lock

 

 

Wide End

 

 

Coupling

Open

3" (8 cm) to

 

 

 

 

4" (10 cm)

 

Closed

 

 

C Insert tubes into coupling.

D Tighten coupling to join tubes.

 

 

Slide Bar/Coupling Lock

 

Orient coupling so that

Coupling

 

the impact block is in the

 

 

2:00 or 10:00 o’clock

 

 

positions.

Tube

 

Tube

 

 

Tube

Description

Part Number

Coupling

01329600

 

 

Slide Bar/Coupling Lock

01329700

 

Tube

91409XXX

19 of 59

Image 25
Contents Or maintenance can result in death, injury or Improper installation, adjustment, alteration, serviceProperty damage. Read the Installation, Operation Installation must be done by a contractor qualifiedPage Roberts-Gordon LLC Page Table of Figures Page Manpower Requirements Heater SafetySafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement Side and Back Panel Label Placement Wall Tag Installer ResponsibilityNational Standards and Applicable Codes Clearances are the required distances that Maintain clearances to combustibles at all times for safetyC D InchesCentimeters ModelTube, Standard Reflector Model 45 Tilt Reflector ModelInches Centimeters Tube, Opposite 45 Reflector ModelCentimeters Model Venting InchesNational Standards and Applicable Codes Stainless Steel Major ComponentsBurner Tube Reflector End CapContents of BH-Series Burner Carton Standard Parts ListContents of Core and Extension Packages BH-Series Component Package Guide Model Tubing Length Core Packages Minimum Standard AluminizedHeater Installation Typical Suspension Details Linear Heater Assembly Overview Linear Heater Layout Overview Linear Heater Layout Overview Burner Tube InstallationCoupling and Tube Assembly Tube Clamp Package InstallationOpen Closed2 Coupling and Tube Assembly 1 Coupling and Tube AssemblyNot required on the BH-125/150/175/200 Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube Tube, StandardTube, Opposite Tube Heater Layout Overview Tube Layout Overview Elbow Package Configuration .2.1 Elbow Installation2 Elbow Installation Reflector Joint Detail 5 Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket InstallationDescription Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield Installation3 Grille Installation 2 Grille End Cap InstallationUnited States Requirements VentingCanadian Requirements Horizontal Venting Unvented OperationVertical Venting Unvented Operation Tube TerminationCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeOutside Wall Common Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationHorizontal Outside Air Supply for Double Heater Installation Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions When attaching gas hoseHold gas nipple securely with pipe wrench Failure to follow these instructions can resultLine Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Ladder Diagram Electrical Connection to the Burner Pre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterVehicles and Other Vicinity of the HeaterObjects ReflectorBlower Scroll, Wheel Safety LabelsMotor Burner Cup and Orifice ElectrodeTroubleshooting YES Troubleshooting Flow ChartPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionPage ROBERTS-GORDON LLC will PAY for Warranty is Void ifROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 6.75 Kb Manual 20 pages 37.5 Kb