The ASCD is initiated on unit
FLASH CODES
The UCB will initiate a flash code associated with errors within the system. Refer to UNIT CONTROL BOARD FLASH CODES Table 23.
RESET
Remove the call for cooling, by raising thermostat set- ting higher than the conditioned space temperature. This resets any pressure or freezestat flash codes.
HEATING SEQUENCE OF OPERATIONS
WITH OR WITHOUT ELECTRIC HEAT
When the thermostat calls for the first stage of heating, the low voltage control circuit is completed between “R” and “W1”. The 24vac signal is passed through the UCB to the “Y” contact on the Defrost Control (DC) assuring the reversing valve cannot be energized, except during defrost. If the ASCD timer is satisfied the UCB will energize compressor contactor M1.
If the compressor alone cannot satisfy the heating requirements, a second stage call from the thermostat completes the circuit between “R” and “W2”. This 24vac signal is passed through the UCB to the electric heat section (if available). The total available kW of electric heat will be energized on a call for “W2”.
DEFROST MODE
As mentioned earlier, the defrost control (DC) utilizes a time/temperature defrost scheme. The following two conditions must be met before the DC will enter a defrost mode:
The defrost thermostat (SD) must be closed. This nor- mally open thermostat is mounted on the liquid line and is set to close at 28 ± 4°F.
Once the defrost thermostat closes, the defrost control starts a run timer that must be satisfied before defrost can begin. This is accumulated compressor run time. The selection pin is factory set at 60 minutes, but is field adjustable to 30, 60 or 90 minutes.
When the DC enters the defrost mode, it’s
1.The liquid line thermostat is open. It is set to open at 55 ± 4°F.
2.The maximum defrost run time of 10 minutes is met.
FORCED DEFROST
The processor on the defrost board is only energized when the defrost sensor (DS) is closed.
To create a forced defrost:
1.The DS must either be closed or a jumper must be placed across the DFS terminals on the board.
2.Place a jumper across the test pin terminals on the board.
Depending on the selected defrost minimum run time of 30, 60 or 90 minutes, the board will go into defrost in 7.5, 15 or 22.5 seconds.
The DC will remain in defrost until the jumpers across the DS and the test pin terminals are removed.
Once the jumpers are removed, the board then ter- minates defrost when the DS opens or a maximum of 10 minutes after the test pin jumper is removed, whichever comes first.
SAFETY CONTROLS
The control circuit includes the following safety con- trols:
1.Temperature Limit Switch (TLS) - This control is located inside the heater compartment and is set to open at the temperature indicated in the Electric Heat Limit Control Setting Table 21. It resets auto- matically. The limit switch operates when a high temperature condition, caused by inadequate sup- ply air flow occurs, thus shutting down the heater and energizing the blower.
30 | Unitary Products Group |