United States Stove 6035 Glass Maintenance, Removal And Replacement, Cleaning The Glass

Page 14
GLASS MAINTENANCE, REMOVAL AND REPLACEMENT

GLASS MAINTENANCE, REMOVAL AND REPLACEMENT

Your American Harvest Corn/Pellet Stove comes to you with the glass door installed in place, ready for use. The glass is surrounded on the edges with a gasket and seated in a glass channel. It is held in place with four (4) clips.

REMOVAL OF BROKEN OR DAMAGED CERAMIC GLASS

Open the door and lift off of hinges. If the door is tight, tap gently on the bottom of the door with your hand or rubber hammer. Lay door down on newspaper with glass clips facing you. Using a #2 Phillips screwdriver, loosen the screws and take off the glass clips. Remove the broken glass carefully and discard.

Reverse the above procedure for replacing new glass with new gasket.

WARNING

Do not operate unit with broken glass.

Do not substitute original factory glass.

You must use only factory authorized glass;

Do not slam door shut.

Do not strike glass.

Do not use abrasive cleaners.

Do not clean when glass is hot.

CLEANING THE GLASS

When the fire is first started, it will produce some smoke. The smoke might accumulate on the glass surface. Before the fire gets hot, open the door and wipe the glass surface off with a damp rag. Do not touch the surface with your hands. If after constant use, the glass is dirty, you must clean the glass so that it will not become etched with the fly ash. When the glass has cooled off, take a damp rag, put a little fly ash from the unit on it and clean the glass. If this does not clean the glass use a non-abrasive spray; 409 works well.

GLASS CLIPS

14

USSC

Image 14
Contents K e e p i n g North America Warm Since CORN & PELLET MULTIFUEL STOVE6035 SAVE THESE INSTRUCTIONSQUALIFIED HEATER INSTALLER SPECIFICATIONSNOTE YOUR UNIT MUST BE INSTALLED BY A CONGRATULATIONSUSSC SAFETY STEPSBURNING SOLID FUELS BURNING SOLID FUELS continued WOOD PELLETSFLOOR PROTECTION INSTALLATION REQUIREMENTSCLEARANCES TO COMBUSTIBLES Parallel / Alcove InstallationHEARTH PROTECTION CLEARANCES TO COMBUSTIBLES continuedGUIDELINES FOR EXHAUST VENTING SYSTEMS DESIGN USSC Wind Hood 3” Min. Diameter 90 DEGREE BEND TERMINATIONWIND HOOD TERMINATION DO NOT INSTALL IN SLEEPING ROOM INSTALLATION CONFIGURATIONSMOBILE HOME INSTALLATION REQUIREMENTS ROOF MUST BE MAINTAINEDCorner Installation ALCOVE INSTALLATION REQUIREMENTSALCOVE-THROUGHTHE WALL INSTALLATION REQUIREMENTS ALCOVE CLEARANCE RECOMMENDATIONSFREESTANDING STOVE INSTALLATION REQUIREMENTS Horizontal Exhaust TerminationINSIDE VERTICAL PIPE WITH ROOF TERMINATION THROUGH THE ROOF REMOVAL OF BROKEN OR DAMAGED CERAMIC GLASS GLASS MAINTENANCE, REMOVAL AND REPLACEMENTCLEANING THE GLASS Do not use abrasive cleanersService Note STOVE CONTROLSAdjustable Door Handle Front View Circuit Board Control PanelLIGHTING INSTRUCTIONS Damper Control FunctionStart-up DISPOSAL OF ASHESCIRCUIT BOARD FUNCTIONS ShutdownDaily Maintenance SETTING THE DRAFTMAINTENANCE INSTRUCTIONS Soot and Flyash - Formation and Need for RemovalSPRING CLEANING Maintenance Instructions ContinuedWeekly Maintenance SPECIALCLEANING/OPERATIONALINSTRUCTIONSMicro Switch AUTOMATIC SAFETY FEATURESHOPPER AUGER SAFETY SWITCH LOCATION Pressure SwitchBack of Circuit Board THERMOSTAT INSTALLATIONFUEL ADDITIVE SOLUTIONS TROUBLE SHOOTINGPROBLEM CAUSESSOLUTIONS TROUBLE SHOOTING continuedPROBLEM CAUSESSOLUTIONS TROUBLE SHOOTING continuedPROBLEM CAUSESWIRING DIAGRAM USSCREPAIR PARTS DIAGRAM-6035 USSCDESCRIPTION REPAIR PARTS LIST-6035PART # HOW TO ORDER REPAIR PARTS