United States Stove 6035 Stove Controls, Adjustable Door Handle, Left/Front View, Service Note

Page 15
STOVE CONTROLS

STOVE CONTROLS

Adjustable Door Handle

lifts up and turns left to open.

Ash Dump Shutoff Pull out to empty ashes out of the firebox area and back heat exchanger area. Make sure to push all the way in when done.

Front View

Circuit Board Control Panel

Open door to access the controls Adjustable Door Handle

Left/Front View

Manual Draft Adjustment Slide in or out to adjust the amount of draft flowing through the firebox.

Service Note:

For service needed inside the cabinet, remove the two screws retaining the side(s). Then open both of the hopper lids and swing the side panel(s) open. BE SURE that the unit is unplugged from the power source before servicing.

Right Side View

Ash Dump Shutoff Pull out to empty ashes out of the firebox area and back heat exchanger area. Make sure to push all the way in when done. (Shown pulled out).

USSC

15

Image 15
Contents SAVE THESE INSTRUCTIONS CORN & PELLET MULTIFUEL STOVE6035 K e e p i n g North America Warm SinceCONGRATULATIONS SPECIFICATIONSNOTE YOUR UNIT MUST BE INSTALLED BY A QUALIFIED HEATER INSTALLERSAFETY STEPS BURNING SOLID FUELSUSSC WOOD PELLETS BURNING SOLID FUELS continuedParallel / Alcove Installation INSTALLATION REQUIREMENTSCLEARANCES TO COMBUSTIBLES FLOOR PROTECTIONCLEARANCES TO COMBUSTIBLES continued GUIDELINES FOR EXHAUST VENTING SYSTEMS DESIGNHEARTH PROTECTION USSC 90 DEGREE BEND TERMINATION WIND HOOD TERMINATIONWind Hood 3” Min. Diameter ROOF MUST BE MAINTAINED INSTALLATION CONFIGURATIONSMOBILE HOME INSTALLATION REQUIREMENTS DO NOT INSTALL IN SLEEPING ROOMALCOVE CLEARANCE RECOMMENDATIONS ALCOVE INSTALLATION REQUIREMENTSALCOVE-THROUGHTHE WALL INSTALLATION REQUIREMENTS Corner InstallationHorizontal Exhaust Termination FREESTANDING STOVE INSTALLATION REQUIREMENTSINSIDE VERTICAL PIPE WITH ROOF TERMINATION THROUGH THE ROOF Do not use abrasive cleaners GLASS MAINTENANCE, REMOVAL AND REPLACEMENTCLEANING THE GLASS REMOVAL OF BROKEN OR DAMAGED CERAMIC GLASSFront View Circuit Board Control Panel STOVE CONTROLSAdjustable Door Handle Service NoteDamper Control Function LIGHTING INSTRUCTIONSShutdown DISPOSAL OF ASHESCIRCUIT BOARD FUNCTIONS Start-upSoot and Flyash - Formation and Need for Removal SETTING THE DRAFTMAINTENANCE INSTRUCTIONS Daily MaintenanceSPECIALCLEANING/OPERATIONALINSTRUCTIONS Maintenance Instructions ContinuedWeekly Maintenance SPRING CLEANINGPressure Switch AUTOMATIC SAFETY FEATURESHOPPER AUGER SAFETY SWITCH LOCATION Micro SwitchTHERMOSTAT INSTALLATION FUEL ADDITIVEBack of Circuit Board CAUSES TROUBLE SHOOTINGPROBLEM SOLUTIONSCAUSES TROUBLE SHOOTING continuedPROBLEM SOLUTIONSCAUSES TROUBLE SHOOTING continuedPROBLEM SOLUTIONSUSSC WIRING DIAGRAMUSSC REPAIR PARTS DIAGRAM-6035REPAIR PARTS LIST-6035 PART #DESCRIPTION HOW TO ORDER REPAIR PARTS