United States Stove 6035 Installation Requirements, Clearances To Combustibles, Floor Protection

Page 5
INSTALLATION REQUIREMENTS

INSTALLATION REQUIREMENTS

FLOOR PROTECTION

The American Harvest Multifuel Stove may be installed on a combustible floor, with proper floor protection, or on a masonry hearth. The hearth or noncombustible floor protector must extend a minimum of (6) inches (152mm)in front and (6) inches (152mm) from each side of the ash removal door.

CLEARANCES TO COMBUSTIBLES

The stove must be installed with the following minimum clearances to side and back wall combustible materials. NOTE: These are minimum clearances to combustible walls established by the testing lab. The amount of room needed on the left side of the unit to access the electrical panel is (6) six inches (152mm).

PARALLEL - A -

Left Sidewall to Top Edge of Unit

6 in./152mm

B -

Sidewall to Flue

5 in./127mm

C -

Backwall to Flue

3 in./75mm

D -

Backwall to Unit

9 in./228mm

E -

Right Sidewall to Top Edge of Unit

2 in./50mm

CORNER - F -

Adjacent Wall to Flue

3 in./75mm

G -

Adjacent Wall to Unit

4 in./100mm

BACK WALL

SIDE WALL

BACK WALL

SIDE WALL

Alcove / Backwall / Sidewall

 

Parallel / Alcove Installation
Corner Installation

USSC

5

Image 5
Contents 6035 CORN & PELLET MULTIFUEL STOVEK e e p i n g North America Warm Since SAVE THESE INSTRUCTIONSNOTE YOUR UNIT MUST BE INSTALLED BY A SPECIFICATIONSQUALIFIED HEATER INSTALLER CONGRATULATIONSUSSC SAFETY STEPSBURNING SOLID FUELS WOOD PELLETS BURNING SOLID FUELS continuedCLEARANCES TO COMBUSTIBLES INSTALLATION REQUIREMENTSFLOOR PROTECTION Parallel / Alcove InstallationHEARTH PROTECTION CLEARANCES TO COMBUSTIBLES continuedGUIDELINES FOR EXHAUST VENTING SYSTEMS DESIGN USSC Wind Hood 3” Min. Diameter 90 DEGREE BEND TERMINATIONWIND HOOD TERMINATION MOBILE HOME INSTALLATION REQUIREMENTS INSTALLATION CONFIGURATIONSDO NOT INSTALL IN SLEEPING ROOM ROOF MUST BE MAINTAINEDALCOVE-THROUGHTHE WALL INSTALLATION REQUIREMENTS ALCOVE INSTALLATION REQUIREMENTSCorner Installation ALCOVE CLEARANCE RECOMMENDATIONSHorizontal Exhaust Termination FREESTANDING STOVE INSTALLATION REQUIREMENTSINSIDE VERTICAL PIPE WITH ROOF TERMINATION THROUGH THE ROOF CLEANING THE GLASS GLASS MAINTENANCE, REMOVAL AND REPLACEMENTREMOVAL OF BROKEN OR DAMAGED CERAMIC GLASS Do not use abrasive cleanersAdjustable Door Handle STOVE CONTROLSService Note Front View Circuit Board Control PanelDamper Control Function LIGHTING INSTRUCTIONSCIRCUIT BOARD FUNCTIONS DISPOSAL OF ASHESStart-up ShutdownMAINTENANCE INSTRUCTIONS SETTING THE DRAFTDaily Maintenance Soot and Flyash - Formation and Need for RemovalWeekly Maintenance Maintenance Instructions ContinuedSPRING CLEANING SPECIALCLEANING/OPERATIONALINSTRUCTIONSHOPPER AUGER SAFETY SWITCH LOCATION AUTOMATIC SAFETY FEATURESMicro Switch Pressure SwitchBack of Circuit Board THERMOSTAT INSTALLATIONFUEL ADDITIVE PROBLEM TROUBLE SHOOTINGSOLUTIONS CAUSESPROBLEM TROUBLE SHOOTING continuedSOLUTIONS CAUSESPROBLEM TROUBLE SHOOTING continuedSOLUTIONS CAUSESUSSC WIRING DIAGRAMUSSC REPAIR PARTS DIAGRAM-6035DESCRIPTION REPAIR PARTS LIST-6035PART # HOW TO ORDER REPAIR PARTS