United States Stove 6035 Alcove Installation Requirements, Alcove Clearance Recommendations

Page 10
ALCOVE INSTALLATION REQUIREMENTS

ALCOVE INSTALLATION REQUIREMENTS

The American Harvest is approved for the standard alcove height of 52 inches, or for a reduced alcove height with a minimum of 19 inches from the top of the stove (clearance for opening top lids). The maximum alcove depth is 48 inches and the listed clearances are a minimum of 6” on the left side, 2” on the right side and 9” to the rear. The 19” clearance is only needed for opening the back lid. If the front lid protrudes out of the opening, a 1” clearance is all that is required.

ALCOVE CLEARANCE RECOMMENDATIONS

2” Min. on Right Side;

6” Min. on Left Side

See statement

above.

52” Min.

ALCOVE-THROUGH THE WALL INSTALLATION REQUIREMENTS

The stove is approved for horizontal exhaust, however, we recommend that the exhaust goes vertically for five feet, or above the eaves of the house. This will help draw smoke out of the stove in the event of a power failure.

Termination Cap

Corner Installation

9” min.

4’ Minimum Wall Thimble

Vertical Pipe

 

2 ft. Horizontal Pipe

Clean-out

 

Tee

 

Wall Thimble

6” min.

12” min.

 

 

 

 

 

Optional

 

 

Direction

Non Combustible

Hearth Pad

Outside Wall Termination

Termination Cap

Type “PL” Vent

10

USSC

Image 10
Contents K e e p i n g North America Warm Since CORN & PELLET MULTIFUEL STOVE6035 SAVE THESE INSTRUCTIONSQUALIFIED HEATER INSTALLER SPECIFICATIONSNOTE YOUR UNIT MUST BE INSTALLED BY A CONGRATULATIONSBURNING SOLID FUELS SAFETY STEPSUSSC BURNING SOLID FUELS continued WOOD PELLETSFLOOR PROTECTION INSTALLATION REQUIREMENTSCLEARANCES TO COMBUSTIBLES Parallel / Alcove InstallationGUIDELINES FOR EXHAUST VENTING SYSTEMS DESIGN CLEARANCES TO COMBUSTIBLES continuedHEARTH PROTECTION USSC WIND HOOD TERMINATION 90 DEGREE BEND TERMINATIONWind Hood 3” Min. Diameter DO NOT INSTALL IN SLEEPING ROOM INSTALLATION CONFIGURATIONSMOBILE HOME INSTALLATION REQUIREMENTS ROOF MUST BE MAINTAINEDCorner Installation ALCOVE INSTALLATION REQUIREMENTSALCOVE-THROUGHTHE WALL INSTALLATION REQUIREMENTS ALCOVE CLEARANCE RECOMMENDATIONSFREESTANDING STOVE INSTALLATION REQUIREMENTS Horizontal Exhaust TerminationINSIDE VERTICAL PIPE WITH ROOF TERMINATION THROUGH THE ROOF REMOVAL OF BROKEN OR DAMAGED CERAMIC GLASS GLASS MAINTENANCE, REMOVAL AND REPLACEMENTCLEANING THE GLASS Do not use abrasive cleanersService Note STOVE CONTROLSAdjustable Door Handle Front View Circuit Board Control PanelLIGHTING INSTRUCTIONS Damper Control FunctionStart-up DISPOSAL OF ASHESCIRCUIT BOARD FUNCTIONS ShutdownDaily Maintenance SETTING THE DRAFTMAINTENANCE INSTRUCTIONS Soot and Flyash - Formation and Need for RemovalSPRING CLEANING Maintenance Instructions ContinuedWeekly Maintenance SPECIALCLEANING/OPERATIONALINSTRUCTIONSMicro Switch AUTOMATIC SAFETY FEATURESHOPPER AUGER SAFETY SWITCH LOCATION Pressure SwitchFUEL ADDITIVE THERMOSTAT INSTALLATIONBack of Circuit Board SOLUTIONS TROUBLE SHOOTINGPROBLEM CAUSESSOLUTIONS TROUBLE SHOOTING continuedPROBLEM CAUSESSOLUTIONS TROUBLE SHOOTING continuedPROBLEM CAUSESWIRING DIAGRAM USSCREPAIR PARTS DIAGRAM-6035 USSCPART # REPAIR PARTS LIST-6035DESCRIPTION HOW TO ORDER REPAIR PARTS