Lochinvar SNR150-100 Troubleshooting, Check control module fuses, Before troubleshooting

Page 58

TM

Installation & Service Manual

13 Troubleshooting

￿WARNING

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Always disconnect power to the water heater before servicing. Failure to comply could result in severe personal injury, death, or substantial property damage.

Check control module fuses

NOTICE

ALWAYS check control module fuses before

replacing control module or any major

 

 

 

components (blower, etc.). If one of these

 

fuses is blown, it can prevent the control

 

module or other components from

 

operating.

￿WARNING Never jumper (bypass) any device except for momentary testing as

outlined in the Troubleshooting chart. Severe personal injury, death, or substantial property damage can result.

1.Turn OFF power to the water heater at the external disconnect switch.

2.Remove top access cover.

3.Remove the control module cover.

4.Inspect fuses F2, F3, F4, and F5, see FIG. 13-1 below.

Before troubleshooting:

1.Have the following items:

a.Voltmeter that can check 120 VAC, 24 VAC, and 12 VDC.

b.Continuity checker.

c.Contact thermometer.

2.Check for 120 VAC (minimum 102 VAC to maximum 132 VAC) to water heater.

3.Make sure the tank is calling for heat.

4.Make sure all external limit controls are installed and operating.

Check the following:

1.Wire connectors to control module and connection board are securely plugged in.

2.Gas pressures:

Maximum: 14 inches w.c. (natural and LP) with no flow (lockup) or with water heater on

Minimum: 4 inches w.c. (natural), 8 inches w.c. (LP) with gas flowing (verify during water heater startup)

58

Figure 13-1Control Module Fuses

F3 - 1.25 AMP FUSE

MAIN BOARD

F4 - 3.15 AMP FUSE

GAS VALVE

F5 - 5 AMP FUSE

PUMPS

F2 - 3.15 AMP FUSE

24V SUPPLY

5.The water heater is shipped with three (3) spare fuses in a plastic bag attached to the control module cover.

6.If necessary, replace open fuse (F3 is 1.25 amps, F2 and F4 are 3.15 amps, and F5 is 5 amps).

Note: Fuses F2 - F5 are all slow blow fuses.

￿WARNING Do not jumper fuse or replace with any fuse except as specified. Failure to comply could

result in severe personal injury, death, or substantial property damage.

7.Install control module cover and top access cover after fuse inspection.

8.Restore power to the water heater at the external disconnect switch and verify water heater operation (Section 10 - Start-up) after completing water heater service.

Image 58
Contents Installation & Service Manual What to do if YOU Smell GASContents Please read before proceeding Hazard definitionsShield How it works BlowerModels SNR150-100 -- SNA285-125 Model SNA400-125 Model SNA500-125Ratings CSADetermine water heater location Installation must comply withCloset and alcove installations Before locating the water heater, check1Closet Installation Minimum Required Clearances Remove water heater from wood pallet Flooring and foundationPrevent combustion air contamination Do not install the Shield water heater into 3Combustion Air Direct from Outside Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct venting optionsCanada Venting and combustion airVent pipe and fittings Air intake/vent connections Air inlet pipe materialsRemoving from existing vent Vent LengthVent and air piping Vent/air termination sidewall If using the alternate sidewall terminationSidewall direct venting Vent Size2Clearance to Gravity Air Inlets Prepare wall penetrations Alternate Field Supplied Option Prepare wall penetrationsTermination and fittings Multiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ASidewall termination optional concentric vent Sidewall termination installationDescription and usage 9Concentric Vent Dimensional Drawing 12Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple Water HeatersVertical termination installation Vertical termination optional concentric vent6Concentric Vent Roof Installation Multiventing vertical terminationsConventional and sidewall venting 1Vertical Direct Venting w/Room AirScalding System pipingSystem water piping methods General piping informationWater chemistry Piping componentsDelta T Single Unit 3Multiple Units Water Tank Supply Connecting gas supply piping Gas connectionsNatural gas Propane gasCheck inlet gas supply Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas valve replacement Gas pressureField wiring 3Low Voltage Field Wiring Connections Inputs Condensate disposal Condensate drainCheck for gas leaks Inspect/fill condensate system Start-upFinal checks before starting the water heater Check system and water heater Start the water heaterIf water heater does not start correctly Check flame and combustion2Operating Instructions Models SNR150-100 -- SNA285-125 3Operating Instructions Models SNA400-125 -- SNA500-125 Operating information Temperature controlProtection features GeneralAdjustable control parameters Water heater temperature regulationSaving parameters Sequence of operation HTR IgnitionShield control module 1Control PanelStatus display screens Status Display ScreensStatus Display Screens cont’d Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check expansion tank Flue vent system and air pipingCheck water system Check water heater relief valveCheck control settings Check ignition ground wiring Check burner flameCheck all water heater wiring Check flame signalOiled bearing circulators Cleaning heat exchangerHandling ceramic fiber materials Niosh stated First AidCheck control module fuses TroubleshootingBefore troubleshooting Check the followingUnit Does Not Modulate No DisplayNo Burner Operation Above 50%Checking temperature sensors Temperature F Resistance ΩTroubleshooting Sequence FlameNo Flame Ign GV/Relay No FlameRunning FailFan Low Manual ResetHigh Limit Fan Speed LowFan Speed High SwitchFan High Sensor OpenParameters ProgrLow 24 VAC Service BlkWatch Dog Error Write EEPromOr Obstruction Combustion Analysis ProcedureGas Valve Adjustment Gas Supply PressureModel SNA400-125 Gas valve adjustment procedureModels SNR150-100 -- SNA285-125 Model SNA500-125Diagrams 120 VACLOW Voltage

SNA400-125, SNR150-100, SNA285-125, SNR200-100, SNA500-125 specifications

Lochinvar has established itself as a leader in the realm of high-efficiency heating solutions, and its line of condensing boilers, including the SNA500-125, SNR200-100, SNA400-125, SNA285-125, and SNR150-100, exemplifies the brand’s commitment to innovation, efficiency, and reliability.

The SNA500-125 model stands out with its impressive heating capacity, designed for larger commercial applications. Featuring advanced modulating burners, it can precisely adjust its output based on real-time demand, significantly enhancing energy efficiency. The stainless steel heat exchanger ensures robust durability and improved thermal performance, while the integrated controls offer advanced diagnostic capabilities and user-friendly operation.

Next in the lineup, the SNR200-100 serves as a versatile option for mid-sized applications. Its compact design allows for flexible installation, making it a valuable choice for facilities with limited space. The boiler incorporates a high-efficiency combustion system that maximizes fuel utilization, while its low NOx emissions technology aligns with environmental standards, reducing the carbon footprint of users.

The SNA400-125 delivers a robust solution for diverse heating needs, equipped with state-of-the-art modulation technology that not only optimizes efficiency but also offers quiet operation – a crucial feature for facilities where noise reduction is paramount. This model also includes built-in redundancy options, enhancing reliability during peak operational periods.

The SNA285-125 provides a balance of performance and efficiency for smaller commercial settings. Its innovative control system offers precise temperature management and easy integration with existing systems. Energy Star certified, this model is not only cost-effective but supports sustainability efforts in various industries.

Lastly, the SNR150-100 is ideally suited for light commercial applications, featuring a compact footprint and excellent heat transfer capabilities. The user-friendly interface and robust safety features make it an excellent choice for operators prioritizing both ease of use and reliability.

All these models incorporate Lochinvar's commitment to superior design and advanced technologies, setting a benchmark in the high-efficiency heating market. With a focus on long-term performance and compliance with modern environmental standards, Lochinvar continues to deliver top-tier solutions tailored to meet diverse customer needs. Whether for large-scale operations or smaller settings, these boilers represent a significant advancement in commercial heating technology.