Lochinvar SNA500-125, SNR200-100, SNA285-125 Prepare wall penetrations, Termination and fittings

Page 20

TM

Installation & Service Manual

3Sidewall direct venting

Prepare wall penetrations

1.Use the factory supplied wall plate as a template to locate the vent and air intake holes and mounting holes.

Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:

4½ inch hole for 3 inch vent pipe

5½ inch hole for 4 inch vent pipe

Drill 3/16" diameter holes for inserting the plastic anchors into the wall.

2.Install the vent and air intake piping through the wall into the vent plate openings. Seal all gaps between the pipes and wall. Use RTV silicone sealant to seal the air pipe. Use the glue (cement/primer) listed in Table 2A on page 15 to seal the vent pipe.

3.Mount and secure the vent plate to the wall using stainless steel screws. Seal around the plate to the wall assuring no air gaps.

4.Assemble the vent cap to the vent plate (see FIG. 3-4A). Insert the stainless steel screws into the vent cap screw hole openings and securely attach the vent cap to the vent plate.

5.Seal all wall cavities.

Figure 3-4ASidewall Termination Assembly

 

AIR PIPING

VENT PIPING

 

 

VENT PLATE

WALL PLATE

VENT CAP

 

GALVANIZED

 

THIMBLE

 

Prepare wall penetrations (Alternate - Field Supplied Option)

1.Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

2.Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole with at least a 1/2 inch clearance around the vent pipe outer diameter:

4½ inch hole for 3 inch vent pipe

5½ inch hole for 4 inch vent pipe

b.Insert a galvanized metal thimble in the vent pipe hole as shown in FIG. 3-4B.

3.Use a sidewall termination plate as a template for correct location of hole centers.

4.Follow all local codes for isolation of vent pipe when passing through floors or walls.

5.Seal exterior openings thoroughly with exterior caulk.

Figure 3-4BAlternate Sidewall Termination Assembly w/Field Supplied Fittings

Termination and fittings

1.The air termination coupling must be oriented at least 12 inches above grade or snow line as shown in FIG. 3-1A, page 18.

2.Maintain the required dimensions of the finished termination piping as shown in FIG. 3-1A, page 18.

3.If using the alternate sidewall termination do not extend exposed vent pipe outside of the building more than what is shown in this document. Condensate could freeze and block vent pipe.

20

Image 20
Contents Installation & Service Manual What to do if YOU Smell GASContents Please read before proceeding Hazard definitionsShield How it works BlowerModels SNR150-100 -- SNA285-125 Model SNA400-125 Model SNA500-125Ratings CSAInstallation must comply with Closet and alcove installationsDetermine water heater location Before locating the water heater, check1Closet Installation Minimum Required Clearances Prevent combustion air contamination Flooring and foundationRemove water heater from wood pallet Do not install the Shield water heater into 3Combustion Air Direct from Outside Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct venting optionsVent pipe and fittings Venting and combustion airCanada Air intake/vent connections Air inlet pipe materialsVent and air piping Vent LengthRemoving from existing vent If using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Vent Size2Clearance to Gravity Air Inlets Termination and fittings Prepare wall penetrationsPrepare wall penetrations Alternate Field Supplied Option Multiple vent/air terminations 5AMultiple Vent Terminations must also comply with -1ADescription and usage Sidewall termination installationSidewall termination optional concentric vent 9Concentric Vent Dimensional Drawing 12Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations 2Vertical Terminations with Multiple Water HeatersVertical termination installation Vertical termination optional concentric vent6Concentric Vent Roof Installation Multiventing vertical terminationsConventional and sidewall venting 1Vertical Direct Venting w/Room AirSystem piping System water piping methodsScalding General piping informationDelta T Piping componentsWater chemistry Single Unit 3Multiple Units Water Tank Supply Connecting gas supply piping Gas connectionsNatural gas Propane gasLength of Pipe in Straight Feet for 1/2 PSI Natural Gas Pipe Capacity ChartCheck inlet gas supply Gas valve replacement Gas pressureField wiring 3Low Voltage Field Wiring Connections Inputs Condensate disposal Condensate drainFinal checks before starting the water heater Start-upCheck for gas leaks Inspect/fill condensate system Start the water heater If water heater does not start correctlyCheck system and water heater Check flame and combustion2Operating Instructions Models SNR150-100 -- SNA285-125 3Operating Instructions Models SNA400-125 -- SNA500-125 Temperature control Protection featuresOperating information GeneralSaving parameters Water heater temperature regulationAdjustable control parameters Sequence of operation HTR IgnitionShield control module 1Control PanelStatus display screens Status Display ScreensStatus Display Screens cont’d Owner maintenance Maintenance Maintenance and annual startupService technician Maintenance Flue vent system and air piping Check water systemCheck expansion tank Check water heater relief valveCheck ignition ground wiring Check burner flame Check all water heater wiringCheck control settings Check flame signalCleaning heat exchanger Handling ceramic fiber materialsOiled bearing circulators Niosh stated First AidTroubleshooting Before troubleshootingCheck control module fuses Check the followingNo Display No Burner OperationUnit Does Not Modulate Above 50%Checking temperature sensors Temperature F Resistance ΩTroubleshooting No Flame Ign FlameSequence No Flame RunningGV/Relay FailManual Reset High LimitFan Low Fan Speed LowSwitch Fan HighFan Speed High Sensor OpenParameters ProgrService Blk Watch Dog ErrorLow 24 VAC Write EEPromCombustion Analysis Procedure Gas Valve AdjustmentOr Obstruction Gas Supply PressureGas valve adjustment procedure Models SNR150-100 -- SNA285-125Model SNA400-125 Model SNA500-125Diagrams 120 VACLOW Voltage

SNA400-125, SNR150-100, SNA285-125, SNR200-100, SNA500-125 specifications

Lochinvar has established itself as a leader in the realm of high-efficiency heating solutions, and its line of condensing boilers, including the SNA500-125, SNR200-100, SNA400-125, SNA285-125, and SNR150-100, exemplifies the brand’s commitment to innovation, efficiency, and reliability.

The SNA500-125 model stands out with its impressive heating capacity, designed for larger commercial applications. Featuring advanced modulating burners, it can precisely adjust its output based on real-time demand, significantly enhancing energy efficiency. The stainless steel heat exchanger ensures robust durability and improved thermal performance, while the integrated controls offer advanced diagnostic capabilities and user-friendly operation.

Next in the lineup, the SNR200-100 serves as a versatile option for mid-sized applications. Its compact design allows for flexible installation, making it a valuable choice for facilities with limited space. The boiler incorporates a high-efficiency combustion system that maximizes fuel utilization, while its low NOx emissions technology aligns with environmental standards, reducing the carbon footprint of users.

The SNA400-125 delivers a robust solution for diverse heating needs, equipped with state-of-the-art modulation technology that not only optimizes efficiency but also offers quiet operation – a crucial feature for facilities where noise reduction is paramount. This model also includes built-in redundancy options, enhancing reliability during peak operational periods.

The SNA285-125 provides a balance of performance and efficiency for smaller commercial settings. Its innovative control system offers precise temperature management and easy integration with existing systems. Energy Star certified, this model is not only cost-effective but supports sustainability efforts in various industries.

Lastly, the SNR150-100 is ideally suited for light commercial applications, featuring a compact footprint and excellent heat transfer capabilities. The user-friendly interface and robust safety features make it an excellent choice for operators prioritizing both ease of use and reliability.

All these models incorporate Lochinvar's commitment to superior design and advanced technologies, setting a benchmark in the high-efficiency heating market. With a focus on long-term performance and compliance with modern environmental standards, Lochinvar continues to deliver top-tier solutions tailored to meet diverse customer needs. Whether for large-scale operations or smaller settings, these boilers represent a significant advancement in commercial heating technology.