Raypak 302B, 902B manual Outdoor Installation, Controls, Freeze Protection

Page 33

Flues supported only by flashing and extended above the roof more than 5 ft should be securely guyed or braced to withstand snow and wind loads.

The air inlet opening MUST be installed 1 ft above the roof line or above normal snow levels that might ob- struct combustion air flow. This dimension is critical to the correct operation of the heater and venting system and reduces the chance of blockage from snow. The vent cap must have a minimum 3 ft vertical clearance from the air inlet opening.

Outdoor Installation

Outdoor models are self-venting when installed with the optional factory-supplied outdoor vent kit and re- quire no additional vent piping. A special vent cap, flow switch cover and air intake hood are provided in accor- dance with CSA requirements, which must be installed directly on the heater. Correct clearances can be found earlier in this section.

Care must be taken when locating the heater out- doors, because the flue gases discharged from the vent cap can condense as they leave the cap. Improper location can result in damage to adjacent structures or building finish. For maximum efficiency and safety, the following precautions must be observed:

1.Outdoor models must be installed outdoors and must use the outdoor vent cap, flow switch cover and air intake hood available from the manufac- turer (sales order option D-11).

2.Periodically check venting system. The heater’s venting areas must never be obstructed in any way and minimum clearances must be observed to prevent restriction of combustion and ventilation air. Keep area clear and free of combustible and flammable materials.

3.Do not locate adjacent to any window, door walk- way, or gravity air intake. The vent must be located a minimum of 4 ft horizontally from such areas.

4.Install above grade level and above normal snow levels.

5.Vent terminal must be at least 3 ft above any forced air inlet located within 10 ft.

6.Adjacent brick or masonry surfaces must be pro- tected with a rust-resistant sheet metal plate.

NOTE: Condensate can freeze on the vent cap. Frozen condensate on the vent cap can result in a blocked flue condition.

NOTE: The vent cap, flow switch cover and air intake hood must be furnished by the heater manufacturer in accordance with its listing (sales order option D-11).

Freeze Protection

When installing this heater in an outdoor location that is susceptible to freezing, sales order option B-22 must be ordered. The B-22 option energizes the heater pump at a preset temperature drop to circulate water and reduces the possibility of freezing and dam- aging the heat exchanger or headers.

Controls

WARNING: Installation, adjustment and service of heater controls, including timing of various operating functions, must be performed by a qualified installer, service agency or the gas supplier. Failure to do so may result in control damage, heater malfunction, property damage, personal injury, or death.

WARNING: Turn off the power to the heater before installation, adjustment or service of the CPW board or any heater controls. Failure to do so may result in board damage, heater malfunction, property damage, personal injury, or death.

CAUTION: This appliance has provisions to be connected to more than one supply source. To reduce the risk of electric shock, disconnect all such connections before servicing.

CAUTION: Risk of electric shock: More than one disconnect switch may be required to de-energize the equipment before servicing.

33

Image 33
Contents Installation & Operating Instructions Deletions None Contents Pay Attention to These Terms Installations at Elevation Before InstallationProduct Receipt Model IdentificationComponent Locations Back Component LocationsGeneral Information General Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Installation Codes InstallationEquipment Base StackingIndoor Installations Outdoor InstallationsClearances Ft 91 cm within a Indoor Units Combustion and Ventilation AirReversing Air Filter Direct VentConventional Combustion Air Supply InstallationsTruSeal Combustion Air All Air from Inside the BuildingWater Piping Canadian InstallationsGeneral Reversing Water ConnectionsCold Water Operation Relief Valve Piping Hydrostatic TestHydronic Heating Temperature & Pressure GaugePump Selection Cold Water StartsPiping Pressure Drop in Feet of Head Feedwater RegulatorAir-Separation/Expansion Tank Three-Way ValvesPool Heating Potable Water and Space HeatingWinterizing Your Heater Automatic Chlorinators and Chemical FeedersPool/Spa Water Chemistry Water HardnessTotal Dissolved Solids PH of WaterGas Supply Connection Gas SupplyModel Table K Maximum Equivalent Pipe LengthElectrical Power Connections Gas Supply PressureField-Connected Controllers Field Wiring Connection Check the Power SourceMaking the Electrical Connections Stage Tankstat Flue Exhaust Tee VentingModel Diameter Order Number Appliance CategoriesVent Terminal Location Support of Vent StackInstallations Canadian InstallationsChanging the Flue Outlet Venting Configurations Venting Installation TipsInstallation Natural Draft Vertical Venting CategoryCommon Venting System TerminationCertified Vertical Venting Combustion Air Air Inlet HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryModel Certified Maximum Combustion Air Inlet Direct Vent Horizontal Through- the-WallVenting EquivalentDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Models 302B-902B Heater Sequence of OperationExternal Lights Color Indication Code Condition Ignition ModuleFlow Switch High Limit Manual ResetHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board UDB Fault HistoryPump Time Delay Table R UDB Fault Messages Water Piping 87%-Efficiency Boilers Special InstructionsVenting Appliance Categories Model 10F 20F 30F Min. Flow Max Flow GpmVertical Venting Category Vent Terminal LocationCondensate Management 752BE Combustion Air 902BE 30’ 80’ Certified Maximum Combustion Air Air Inlet Model VentingDirect Vent Horizontal Through- the-Wall ABS Cpvc Wiring Diagram Pre Start-up START-UPBlower Adjustment Main Burner AdjustmentStart-Up Leak Test Procedure Dual-Seat Gas Valves Safety InspectionFollow-Up Pilot Turn-Down TestLeak Test Post Start-Up CheckOperation Lighting InstructionsTo Turn Off Gas To Appliance Step TroubleshootingMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Semi-Annually WeeklyAnnually As RequiredInside Air Contamination AppendixLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Important Instructions for the Commonwealth of Massachusetts
Related manuals
Manual 2 pages 32.1 Kb

302B, 902B specifications

Raypak is a prominent name in the heating industry, particularly known for its advanced technology and robust design in residential and commercial heating solutions. Two of their notable models, the Raypak 302B and 402B, exemplify innovation and efficiency in hydronic heating systems, designed to meet diverse needs while ensuring optimal performance.

The Raypak 302B and 402B are high-efficiency boilers that utilize gas-fueled systems. The 302B model has a heating capacity of 302,000 BTU/h, while the 402B boasts a maximum capacity of 402,000 BTU/h. This range of heating output makes these models suitable for a variety of applications, from residential heating needs to larger commercial spaces that require a reliable heat source.

One of the standout features of the Raypak 302B and 402B is their use of fire-tube heat exchanger technology. This design promotes efficient heat transfer and allows for lower emissions, thus minimizing the environmental impact. The fire-tube design also contributes to a longer lifespan and reduced maintenance costs, making these boilers a cost-effective solution over time.

Equipped with advanced control systems, the Raypak 302B and 402B ensure precise temperature regulation and improved energy usage. The digital display provides real-time feedback and diagnostics, enhancing user experience and simplifying troubleshooting. These models are also compatible with various building management systems, providing users with versatility in integration to optimize building performance.

In addition to their technological advancements, these boilers are designed with user safety and convenience in mind. They include features such as built-in safety controls, easy access for service and maintenance, and a compact footprint to fit into tight spaces. Their robust construction ensures durability, which is crucial for systems that operate under high demand.

Moreover, both models have been engineered to succeed in various climates, making them reliable choices for users in diverse geographical locations. With their energy-efficient operation, reliable performance, and advanced features, the Raypak 302B and 402B embody quality and innovation in the heating market, ensuring comfortable environments while lowering energy costs and environmental footprints.