Stovax Ceramica Manhattan Wood Stove manual Do not FIX the Flue AT this Stage

Page 13

INSTALLATION INSTRUCTIONS

INSTALLATION

3.1.5To set the flue length, measure the total wall thickness, then add 65mm. This total flue length will give the minimum clearance of 50mm between the rear of the stove and the wall. To cut the flue to length using a hacksaw, first insert the square cardboard fitment into the flue. This will support the inner flue. Cut through the flue and fitment. See diagram

2. ENSURE THE REMAINING FITMENT IS REMOVED FROM THE FLUE. File the cut edges of the flue smooth.

2

AR0630

3.1.6From outside, locate the flue assembly into the hole until the terminal is flat against the wall. Ensure the terminal is vertical. NOTE THE ORIENTATION OF THE TERMINAL.

See diagram 3. Mark the four fixing holes, remove the terminal and drill the holes, inserting the rawplugs supplied.

DO NOT FIX THE FLUE AT THIS STAGE.

3.1.7Position the stove ensuring all appropriate clearances are observed.

3.1.7a When installing with a top flue, please note the flue pipe fits through a hole in the top grill, the dimensions are for floor fixing a top flue installation with clearance for side panels.

3.1.7b Position the engine assembly in its intended location and mark the position of the floor fixing holes at the base of each side of the subframe, minimum fixing dimensions to a rear wall are showin in Diagram 3.

3.1.7c Remove the assembly and drill the two holes using a No.12 masonry bit. Push the rawl plugs into the holes and place the engine assembly in position. Secure to the floor using the screws provided. Sea Diagram 3.

3

AR0631

3.1.7d Having run the gas supply to the stove, PURGE THE SUPPLY. This is essential to expel any debris that may block the gas controls. Connect the gas supply to the 8mm compression elbow at the RH rear corner of the stove, ensuring that the pipe position does not interfere with the location of the outer casing. See Diagram 4.

4

AR0934

3.1.7e Open the second carton and carefully remove the ceramic outer casing components. Gently position the LH side so that the bolt heads on the engine subframe locate in the keyhole slots on the back of the panel and gently slide into place so that the ceramic comes to rest on the floor. Repeat the procedure for the RH side. See Diagram 5.

5

AR0488

13

Image 13
Contents Ceramica Manhattan PR0848 Issue 2 FebruaryContents Flue Check Pass Fail Appliance Commissioning ChecklistGAS Check General User InstructionsLighting the Stove Turning OFF the StoveHandling & Disposal of Fire Ceramics Cleaning the FireFuel BED Arrangements Flame Failure Device Installation Details‘RUNNING IN’ ServicingTechnical Specification Installation InstructionsFlue and Chimney Requirements Site RequirementsTimber Framed Buildings Guard Supplied TOP ExitALL Appliances TOP Flue UP & OUT with Additional BendOptional Extra Flue Lengths & Bends Nominal Actual Stainless AnthraciteVentilation Installation of the GAS SupplyAppliance Location Appliance requires no additional ventilationControl Upgrade InstallationSafety Precautions Installation of the StoveDo not FIX the Flue AT this Stage AR0490 Table a TOP Exit Flue Vertical and Horizontal Restrictors Vertical & Horizontal FlueVertical Flue Height Horizontal Length Restrictor Size Table a TOP Exit Vertical only Including Offset TOP Exit Vertical FlueRemove ANY Cardboard Fitment Remaining Vertical Height Restrictor SizeFuelbed Arrangements Lighting Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsServicing Requirements Ignition Functional CheckPilot will not Stay LIT or Fire Goes OUT in USE Flame Failure Functional CheckNo Spark Main Burner Replacing PartsPilot Unit Ignition Lead Piezo Magnetic Safety ValveGAS Valve Main InjectorChanging Between GAS Types Primary Aeration PlateShort Spares List Service Records Member of the Stovax Group