Stovax Ceramica Manhattan Wood Stove manual AR0490

Page 14

INSTALLATION INSTRUCTIONS

INSTALLATION

3.1.7f Remove the cast iron door using the tool provided and carefully place to one side. Gently position the front ceramic panel so that the side panels locate inside the returns on the front panel. Engage the bolt heads in the brackets on the back of the panel and gently slide into place so that the ceramic comes to rest on the floor. Ensure that the opening in the panel sits centrally around the fire box opening. See Diagram 6.

6

AR0490

3.1.7g Place the top ceramic panel into position so that the two spring clips slide against the inside of the side panels. Gently position so that it sits centrally in the outer panels. Place the cast iron grille into the recess in the centre of the top panel and locate the blanking plate into the grille, (if required). See Diagram 7

7

AR0492

3.1.8Before fixing the flue in the wall, apply a bead of suitable weatherproof sealant (silicone or similar) around the perimeter of the back face of the terminal B Diagram 8. Feed the flue through the wall ensuring it travels smoothly. Working from inside, engage the flue in the inner and outer spigots, making sure the rubber seals on the spigots are not damaged.

From the outside, insert the four screws in the flanges of the flue terminal ensuring the sealant has formed a water tight joint to the wall. Finally secure the flue to the spigot by drilling a 3.5mm hole through the larger hole in the spigot and insert the stainless steel screw provided; refer to C in Diagram 8.

8

AR0606

Any terminal which is less than 2 meters above any access (level ground, balcony or above a flat roof to which people have access), is to be fitted with the guard supplied, see diagram 9.

9

AR0603

14

Image 14
Contents PR0848 Issue 2 February Ceramica ManhattanContents GAS Check Appliance Commissioning ChecklistFlue Check Pass Fail Lighting the Stove User InstructionsGeneral Turning OFF the StoveFuel BED Arrangements Cleaning the FireHandling & Disposal of Fire Ceramics ‘RUNNING IN’ Installation DetailsFlame Failure Device ServicingInstallation Instructions Technical SpecificationTimber Framed Buildings Site RequirementsFlue and Chimney Requirements TOP Exit Guard SuppliedOptional Extra Flue Lengths & Bends TOP Flue UP & OUT with Additional BendALL Appliances Nominal Actual Stainless AnthraciteAppliance Location Installation of the GAS SupplyVentilation Appliance requires no additional ventilationSafety Precautions InstallationControl Upgrade Installation of the StoveDo not FIX the Flue AT this Stage AR0490 Vertical Flue Height Horizontal Length Restrictor Size Vertical & Horizontal FlueTable a TOP Exit Flue Vertical and Horizontal Restrictors Remove ANY Cardboard Fitment Remaining TOP Exit Vertical FlueTable a TOP Exit Vertical only Including Offset Vertical Height Restrictor SizeFuelbed Arrangements Lighting Commissioning CommissioningServicing Requirements Servicing / Fault Finding ChartsServicing Instructions Ignition Functional CheckNo Spark Flame Failure Functional CheckPilot will not Stay LIT or Fire Goes OUT in USE Pilot Unit Replacing PartsMain Burner Ignition Lead GAS Valve Magnetic Safety ValvePiezo Main InjectorShort Spares List Primary Aeration PlateChanging Between GAS Types Service Records Member of the Stovax Group