Kohler Discovery manual Refer to section ‘1. Solid Wall or

Page 15

2. Solid Wall or Stud Partition

(Using Rear Fixing Points on Shower Control)

2.1Refer to section: ‘1. Solid Wall or

Stud Partition Installation (Using Securing Brackets - Mounting off Front Face)’ and follow instructions 1 to 4.

2.2Cut away the plasterboard or brick work to the required depth.

Important! This depth ‘X’ will depend on the finished wall thickness e.g. tiles or facia board. Refer to the table for this measurement.

For stud partitions depth ‘X’ refers to the distance from the rear mounting e.g. wooden baton, to the front of the wall (before tiling).

Rear Support

Depth ‘X’

Finished Wall

Surface

Finished Wall

Thickness

Finished Wall Thickness

Wall Cutout Depth ‘X’

(e.g. tile and adhesive)

 

6 mm

76 - 58 mm

8 mm

74 - 56 mm

10 mm

72 - 54 mm

 

 

12 mm

70 - 54 mm

14 mm

68 - 54 mm

 

 

16 mm

66 - 54 mm

 

 

18 mm

64 - 54 mm

20 mm

62 - 54 mm

22 mm

60 - 54 mm

24 mm

58 - 54 mm

 

 

15

Image 15
Contents These instructions are to be left with the user Contents Introduction Safety WarningsPack Contents Dimensions Flow Rates SpecificationsTemperatures PressuresThermostatic Shut-down ConnectionsGas heated system Installation RequirementsKey to symbols Gravity fed systemMains pressurised instantaneous Hot water system thermal storePumped system General InstallationInstallation Methods Mm Max Outlet Pipe BIR Page Page Refer to section ‘1. Solid Wall or Page Fit the securing brackets to the shower valve M5 Fixing Holes Securing Screws Control Assembly ‘Commissioning’ Reversed Supplies Commissioning Maximum Temperature SettingOperation Symptom CAUSE/RECTIFICATION Fault DiagnosisMaintenance Cleaning FiltersLubricants Spare Parts Page Customer Service