Kohler Discovery manual ‘Commissioning’

Page 20

5.Align the flow control lever so that the lever is pointing up (refer to illustration).

6.Slide the flow control lever and concealing plate over the flow control hub.

7.Latch the top of the concealing plate over the top of the backplate.

Note! You will need to push the concealing plate up and over the lip on top of the backplate (refer to illustration).

8.Clip the bottom of the concealing plate into position.

9.Align the temperature control knob with the hub and push the knob onto the concealing plate.

Note! If the finished wall thickness is less than 8 mm the temperature hub spacer will need to be removed, refer to section: ‘Commissioning’.

Note! The Thermostatic Shower Control is preset to approximately 43°C at the factory. If adjustment is required, refer to section:

‘Commissioning’.

Push up and Latch over the Top of the Backplate

Align Flow Lever as Shown

‘Click’ into Position

20

Image 20
Contents These instructions are to be left with the user Contents Safety Warnings IntroductionPack Contents Dimensions Specifications TemperaturesPressures Flow RatesConnections Thermostatic Shut-downInstallation Requirements Key to symbolsGravity fed system Gas heated systemPumped system Mains pressurised instantaneousHot water system thermal store Installation GeneralInstallation Methods Mm Max Outlet Pipe BIR Page Page Refer to section ‘1. Solid Wall or Page Fit the securing brackets to the shower valve M5 Fixing Holes Securing Screws Control Assembly ‘Commissioning’ Reversed Supplies Maximum Temperature Setting CommissioningOperation Fault Diagnosis Symptom CAUSE/RECTIFICATIONLubricants MaintenanceCleaning Filters Spare Parts Page Customer Service