Kohler Discovery manual

Page 16

2.3Mark the positions of the fixing screw holes on the wall.

2.4For solid walls drill two 6 mm holes for the wall plugs.

2.5Fit the wall plugs (supplied) and fix the shower valve to the wall with the securing screws (supplied).

Note! For stud partition installations alternative fixings may be required (not supplied) to fix the shower valve to the rear face of the wall cavity or to a timber noggin.

Important! At this point position the building-in shroud onto the shower valve and make sure that it is level, both horizontally and vertically.

2.6Refer to section: ‘1. Solid Wall or

Stud Partition Installation (Using Securing Brackets - Mounting off Front Face)’ and follow instructions 11 to 18.

Outlet Pipe to Fittings

Securing

Screw

Cold Supply

Hot Supply

16

Image 16
Contents These instructions are to be left with the user Contents Safety Warnings IntroductionPack Contents Dimensions Specifications TemperaturesPressures Flow RatesConnections Thermostatic Shut-downInstallation Requirements Key to symbolsGravity fed system Gas heated systemHot water system thermal store Mains pressurised instantaneousPumped system Installation GeneralInstallation Methods Mm Max Outlet Pipe BIR Page Page Refer to section ‘1. Solid Wall or Page Fit the securing brackets to the shower valve M5 Fixing Holes Securing Screws Control Assembly ‘Commissioning’ Reversed Supplies Maximum Temperature Setting CommissioningOperation Fault Diagnosis Symptom CAUSE/RECTIFICATIONCleaning Filters MaintenanceLubricants Spare Parts Page Customer Service