Kohler Discovery manual Fit the securing brackets to the shower valve

Page 17

3. Laminated Panel

(Using Securing Brackets - Mounting off Rear Face)

Note! For laminated panels the shower valve must be positioned from the rear of the panel.

Panel thickness must be between 4 and 22 mm (if a thicker panel is used it will be necessary to recess the securing brackets into the rear of the panel).

Important! Make sure that there is a minimum clearance of 64 mm behind the laminated panel to house the shower valve.

3.1Remove the three securing screws and remove the shower valve from the building-in shroud (retain the screws for later use).

3.2Mark the position of the shower valve, a cut out 150 x 170 mm (Max) is required.

Note! Use a spirit level to make sure that the hole cutout will be horizontal and vertical.

3.3Carefully cut out the laminated panel and make sure that the building-in shroud fits inside the hole cutout.

3.4Fit the securing brackets to the shower valve.

Important! The brackets must be fixed vertically as illustrated.

Important! Make sure that the correct holes are used, otherwise the backplate will not fit (see Warning below).

3.5Re-fit the building-in shroud to the shower valve using the three fixing screws.

M5 Fixing

Hole

Backplate

Securing Hole

170 mm Max

150 mm Max

Backplate

Securing Holes

Filter Plug

Warning! Do not drill any holes for the bottom securing bracket. The bracket is used only to align the valve. If holes are drilled they will not be covered by the concealing plate.

17

Image 17
Contents These instructions are to be left with the user Contents Introduction Safety WarningsPack Contents Dimensions Temperatures SpecificationsPressures Flow RatesThermostatic Shut-down ConnectionsKey to symbols Installation RequirementsGravity fed system Gas heated systemPumped system Mains pressurised instantaneousHot water system thermal store General InstallationInstallation Methods Mm Max Outlet Pipe BIR Page Page Refer to section ‘1. Solid Wall or Page Fit the securing brackets to the shower valve M5 Fixing Holes Securing Screws Control Assembly ‘Commissioning’ Reversed Supplies Commissioning Maximum Temperature SettingOperation Symptom CAUSE/RECTIFICATION Fault DiagnosisLubricants MaintenanceCleaning Filters Spare Parts Page Customer Service