1.14Re-fit the building-in shroud to the shower valve using the three fixing screws.

1.15Using the building-in shroud as a guide for the finished wall thickness, finish the wall.

Caution! Make sure that the finished wall is within the minimum and maximum limits otherwise the control components will not fit correctly.

1.16Remove the building-in shroud. Retain the three securing screws for securing the backplate.

1.17Fit the shower fittings, refer to your fittings installation and user guide for instructions.

1.18Fit the control assembly, refer to section: ‘Control Assembly’.

Spirit Level

Building-in

Shroud

Securing

Screws

Minimum

Building-in Depth

Maximum

Building-in Depth

14

Image 14
Contents These instructions are to be left with the user Contents Safety Warnings IntroductionPack Contents Dimensions Pressures SpecificationsTemperatures Flow RatesConnections Thermostatic Shut-downGravity fed system Installation RequirementsKey to symbols Gas heated systemPumped system Mains pressurised instantaneousHot water system thermal store Installation GeneralInstallation Methods Mm Max Outlet Pipe BIR Page Page Refer to section ‘1. Solid Wall or Page Fit the securing brackets to the shower valve M5 Fixing Holes Securing Screws Control Assembly ‘Commissioning’ Reversed Supplies Maximum Temperature Setting CommissioningOperation Fault Diagnosis Symptom CAUSE/RECTIFICATIONLubricants MaintenanceCleaning Filters Spare Parts Page Customer Service