Installation | 31 | ||
|
| ||
Safety Information on Installation | 31 | ||
Preparation | 33 | ||
Step 1.1 | Choosing the installation location |
| |
Step 1.2 | Packing and unpacking |
| |
Step 1.3 | Checking and preparing accessories and tools |
| |
Step 1.4 | Drilling a hole through the wall |
| |
Step 1.5 | Taping the pipes, cables, and drain hose |
| |
Indoor Unit Installation | 38 | ||
Step 2.1 | Disassembling the cover panel |
| |
Step 2.2 | Disassembling the installation plate |
| |
Step 2.3 | Connecting the cables (assembly cable) |
| |
Step 2.4 | Optional: Extending the power cable |
| |
Step 2.5 | Installing and connecting the drain hose |
| |
Step 2.6 | Optional: Extending the drain hose |
| |
Step 2.7 | Optional: Changing the direction of the drain hose |
| |
Step 2.8 | Installing and connecting the assembly pipes to the refrigerant pipes (assembly pipe) |
| |
Step 2.9 | Shortening or extending the refrigerant pipes (assembly pipe) |
| |
Step 2.10 | Fixing the installation plate |
| |
Step 2.11 | Fixing the indoor unit to the installation plate |
| |
Step 2.12 | Assembling the cover panel |
| |
Outdoor Unit Installation | 46 | ||
Step 3.1 | Fixing the outdoor unit in place |
| |
Step 3.2 | Connecting the cables and the refrigerant pipes |
| |
Step 3.3 | Evacuating the air |
| |
Step 3.4 | Adding refrigerant |
| |
Installation Inspection | 49 | ||
Step 4.1 | Performing the gas leak tests |
| |
Step 4.2 | Running the Smart Install mode |
| |
Step 4.3 | Performing final check and trial operation |
|
English 3