Trial operation
Inspection before trial operation
1.Check the power and communication cable of the indoor and outdoor unit.
2.Turn on the power 2 hours before initial operation to
3.Check the power supply between the outdoor unit and the cabinet panel.
4.Once the outdoor unit is turned on, it performs the tracking to check the connected indoor unit and option.
• Turn on the power 2 hours before initial operation so the crank case heater can be heated enough to start the CAUTION system.
Trial operation
1.Run the unit by KEY mode.
-- Make sure that all the indoor units are properly operating.
2.Check the indoor and outdoor unit’s operating status.
3.If error occurs during trial operation, check the error code of the unit and follow the instruction.
4.Explain to the customer how to use the air conditioner according to the user’s manual.
5.Give this installation manual to the user.
52
PAC_아프리카 |