Trial operation

Inspection before trial operation

1.Check the power and communication cable of the indoor and outdoor unit.

2.Turn on the power 2 hours before initial operation to pre-heat the crank case heater.

3.Check the power supply between the outdoor unit and the cabinet panel.

-- Check the 3 phase power of the compressor and the distribution board [R (Red), S (White), T (Black)] with the 3 phase tester.

-- Check the line voltage(R-S, S-T, T-R) 380-415V power and phase voltage (R-N, S-N, T-N) 220-240V power with the voltage meter.

4.Once the outdoor unit is turned on, it performs the tracking to check the connected indoor unit and option.

• Turn on the power 2 hours before initial operation so the crank case heater can be heated enough to start the CAUTION system.

Trial operation

1.Run the unit by KEY mode.

-- Operate the unit by KEY mode.

-- Inspect the compressor sound during the initial operation. If roaring sound is heard, stop the operation.

-- If roaring sound is heard and the pressure does not change, back-lashing of the compressor may occur. Therefore, check the power supply of the compressor. If the problem occurs continuously, check the compressor power cable. (3 Phase: T1(L1)(R)(U) Red, T2(L2)(S)(V) White, T3(L3)(T)(W) Black

-- Make sure that all the indoor units are properly operating.

2.Check the indoor and outdoor unit’s operating status. -- Check if the indoor unit cools.

-- Indoor unit control: Check the air flow direction and fan speed. -- Check for indoor and outdoor unit’s abnormal running noise.

-- Check for proper drainage from the indoor unit in cooling mode.

3.If error occurs during trial operation, check the error code of the unit and follow the instruction.

4.Explain to the customer how to use the air conditioner according to the user’s manual.

5.Give this installation manual to the user.

52

PAC_아프리카 중동향AP80S0A_IBIM_34514A-02_EN.indd 52

2015-04-23 오후 2:19:00

Image 53
Contents 08000-7267864 Questions or COMMENTS?Thank you for purchasing this Samsung product Air ConditionerContents Features of your new air conditionerImportant safety symbols and precautions Safety precautionsXXFailing to do so may result in electric shock or fire XXThis may result in electric shock or fireXXWhen there is fire, this may cause spread of fire For Power SupplyXXThis may result in electric shock Do not place objects or devices under the indoor unitDo not operate the appliance with wet hands Do not drink the water from the air conditioner Do not clean the inside of the air conditioner by yourselfChecking the auxiliary power switch Using outdoor unitOperational temperature and humidity range Auxiliary power switch Elcb Earth Leakage Circuit BreakerTo open the panel Viewing the partsMain parts Control panel and the display Locking the control panelUsing the air conditioner with the control panel Installing the batteries Checking the remote controllerRemote controller button Cool Basic operationAuto DryPress Button to start the operation of the air conditioner Press Button to adjust the desired temperatureTurbo operation Adjusting the air flow directionPress Operation will operate for 30 minutesPress the button when the air conditioner is on Timer functionSmart saver operation You can turn the air conditioner off at your desired timeCleaning the indoor unit Cleaning and maintaining the air conditionerCleaning the outdoor unit heat exchanger Service centerCleaning the air filter Periodical checks Maintaining the air conditionerTroubleshooting Function See if the timer is already setClean the air filter if it is dirty If the message General information Installing the unitAccessing its internal components Do not install the air conditioner in following places Power supply line, fuse or circuit breakerMake sure that you earth the cables Complete, electric shock or fire may occurWhen moving with a crane Preparation for installationWhen moving with a fork lift Indoor outdoor unit type and combinationIndoor unit Deciding on where to install the productWires on the wall Fix the wire on the groundOutdoor unit Personal injury or property damageSelecting appropriate location for installation Wear protective goggles and mask before spraying When the air outlet is opposite the wall When there are no tall obstacles around the outdoor unitWhen 3 sides of the outdoor unit are blocked by the wall Space requirementsPipe length between the indoor and the outdoor unit When there is tall obstacle around the outdoor unitWhen installing 1 outdoor unit Installing duct for horizontal exhaust discharge Preparing the installationInstalling the outdoor unit in harsh environments When installing ductsInstalling outdoor unit AP80S0X Installing indoor unitOutdoor unit base mount and anchor bolt position Refrigerant piping work Connecting the pipesRemoving the connection pipe InjuryKeep the pipe length as short as possible Outdoor unit pipe connection AP80S0XTemper grade and minimum thickness of the refrigerant pipe Selecting refrigerant pipeModel name Liquid side mm Gas side mm Outer diameter mm/inch Minimum thickness mm Temper gradeStoring refrigerant pipe Direction of the pipe when brazingNitrogen flushing brazing Stored place Stored time Sealing typeCorrect Inclined Damaged surface Cracked Uneven thickness Cutting or flaring the pipesOuter diameter Dmm Tightening flare connection part Connecting the drain hosePipe bending Piping materialInsulating refrigerant pipe Selecting the insulator of the refrigerant pipeFfPipe insulation To prevent moisture from enteringElectrical work Wiring work0Not included Power supply and wire specificationAP80S0A / AP0AS0A Connecting power and communication cableSelecting solderless ring terminal Screw Tightening torque kgf∙cm Connecting the power terminalFixing the power cable FfGrounding must be done by installation specialist Grounding the power cableWhen using the exclusive terminal for grounding Grounding workIf you are using the grounding on the switching board Grounding work procedureFfMake sure that grounding work is done in below procedure Procedure ExplanationGas leak test and vacuum drying Allowable refrigerant pipe length How to add refrigerantRefrigerant charging Setting the option switch of the indoor unit Setting the option switches & function keys Setting the main PCB option K1 K2 K3 K4K2 Number of pressing Setting the outdoor unit KEYSegment display Display PressingCheck lists after completing the installation Inspection before trial operation Trial operationTrial operation Make sure that all the indoor units are properly operatingError display Error diagnosisError display Error description LED displayTwist the wire cores together and push it in to the sleeve How to connect your extended power cablesInsulation tape