GAS-FIRED WATER BOILER — Boiler Manual

 

Annual startup (continued)

Perform startup and checks

1.Start boiler and perform checks and tests specified on pages 23 through 26 (and Control Supplement).

2.Verify cold fill pressure is correct and that operating pressure does not go too high.

3.Complete the check-out procedure on page 26.

Check flame signal

1.Flame signal (DC volts from low voltage terminal strip terminal 9 to ground) should be at least 4 VDC.

2.A lower flame signal may indicate a fouled ignitor or damaged ignitor insulation. If cleaning the ignitor does not improve, ground wiring is in good condition, and ground continuity is satisfactory, replace the ignitor.

3.See Troubleshooting in the Ultra Control Supplement for other procedures to deal with low flame signal.

Check burner flame

The boiler contains ceramic fiber materials. Use care when handling these materials per instructions on page 29 of this manual. Failure to comply could result in severe personal injury.

1.Inspect flame through observation window using the procedure on page 25.

2.If flame is unsatisfactory at either high fire or low fire, turn off boiler and allow boiler to cool down. Then remove burner and clean it thoroughly using a vacuum cleaner or compressed air. Do not use compressed air to clean burner if performed inside a building.

3.To access burner, remove the heat exchanger cover plate following the procedure on page 33.

4.When replacing burner, ensure gasket is in good condition and correctly positioned. After tightening the three retainer screws, bend up the retainer tabs as shown in Figure 16 to prevent screw rotation.

5.After servicing, replace boiler components. Retest boiler.

Check flue gas temperature

1.Place the control display in Information mode while the boiler is operating at high fire. See Ultra Control Supplement for details.

2.The flue gas temperature (electronic display first digit shows “5”) must not be more than 60°F higher than the return water temperature (display first digit shows “2”).

3.If the flue temperature is higher than this, shut down the boiler, allow to cool, and follow the procedure on pages 33 through 34 to clean the heat exchanger.

Review with owner

1.Review the User’s Information Manual with the owner.

2.Emphasize the need to perform the maintenance schedule specified in the User’s Information Manual (and in this manual as well).

3.Remind the owner of the need to call a licensed contractor should the boiler or system exhibit any unusual behavior.

4.Remind the owner to follow the proper shutdown procedure and to schedule an annual startup at the beginning of the next heating season.

Figure 16 Burner assembly

32

Part number 550-101-233/0903

Image 32
Contents Gas-fired water boiler HOW IT Works GAS-FIRED Water BOILER, with PhD Technology Contents Hazard definitionsWhen servicing boiler Please read before proceedingBoiler operation Boiler waterInstallations must comply with Prepare boiler locationBefore locating the boiler, check Provide clearancesResidential garage installation Flooring and foundationProvide air openings to room Vent and air pipingSeal any unused openings in the common venting system When removing a boiler from existing common vent systemPrevent combustion air contamination Prepare for propane if operating on propane Ultra-80 Prepare boilerRemove boiler from crate Prepare for propane if operating on propane Ultra-155 to Placing floor-mounted boilersPlacing wall-mounted boilers Set boiler in place and check levelPerform hydrostatic pressure test Prepare boiler for testFill and pressure test Drain and remove fittingsInstall water piping Install relief valveAdditional controls, when required General piping informationSizing space heat system piping System water piping methodsCirculators Sizing DHW system piping Required boiler water flow rate, GPM, at 180FControlling the system circulator Zoning with zone valvesConnect boiler to system as shown in when Zoning with circulators Setting boiler outlet water target temperature Radiant heating applicationsChilled water systems Chilled water system plus optionalPrepare condensate fittings Install vent and combustion air pipingVenting, combustion air & condensate line Connect condensate drain Condensate drain Ultra-80Wall-mounted boilers Connecting gas supply pipingGas piping Natural Gas Propane GasPipe sizing for natural gas Natural gas supply pressure requirementsFreeze protection when used StartupCheck/control water chemistry Fill and test water systemCheck for gas leaks Final checks before starting boiler Check thermostat circuitsInspect/fill condensate system To start the boilerCheck flame & combustion Adjust and test boiler controlsCheck system and boiler Check-out/startup verification Check-out/startup verification Installation certificate Annual startup and general maintenance Service and maintenance schedulesAnnual startup Handling ceramic fiber materialsClean condensate trap Check water systemCheck all piping for leaks Check expansion tank Check air openingsCheck ignition ground wiring Check all boiler wiringCheck control settings Check boiler relief valveCheck flame signal Check flue gas temperaturePerform startup and checks Check burner flameMaintenance general General maintenanceCleaning boiler heat exchanger Replace boiler jacket front door after startup or servicingExchanger cleaning ALL models Maintenance and annual startupAccess exchanger Ultra-155, -230, -310 Only Replacement parts Jacket parts Replacement parts Heat exchanger and piping Ultra-80 Replacement parts Heat exchanger and piping Ultra-155 to Replacement parts Controls Dimensions Ratings DOE