Weil-McLain 105, 80, 230, 310, 155 manual Prevent combustion air contamination

Page 8

1 GAS-FIRED WATER BOILER — Boiler Manual

Prepare boiler location (continued)

Prevent combustion air contamination

Install air inlet piping for the Ultra boiler as described in the Ultra Boiler Vent Supplement. Do not terminate vent/ air in locations that can allow contamination of combustion air. Refer to Table 1 for products and areas which may cause contaminated combustion air.

You must pipe combustion air to the boiler air intake. Ensure that the combustion air will not contain any of the contaminants below. Contaminated combustion air will damage the boiler, resulting in possible severe personal injury, death or substantial property damage. Do not pipe combustion air near a swimming pool, for example. Also avoid areas subject to exhaust fumes from laundry facilities. These areas will always contain contaminants.

Table 1 Corrosive contaminants and sources

When removing a boiler from existing common vent system:

Do not install the Ultra boiler into a common vent with any other appliance. This will cause flue gas spillage or appliance malfunction, resulting in possible severe personal injury, death or substantial property damage.

Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.

At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.

a.Seal any unused openings in the common venting system.

b.Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion or other deficiencies which could cause an unsafe condition.

c.Test vent system — Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

d.Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.

e.Test for spillage at draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar, or pipe.

f.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined herein, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous conditions of use.

Any improper operation of common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1 — latest edition. Correct by resizing to approach the minimum size as determined using the appropriate tables in Part 11 of that code. Canadian installations must comply with B149.1 or B149.2 Installation Code.

8

Part number 550-101-233/0903

Image 8
Contents Gas-fired water boiler HOW IT Works GAS-FIRED Water BOILER, with PhD Technology Contents Hazard definitionsWhen servicing boiler Please read before proceedingBoiler operation Boiler waterInstallations must comply with Prepare boiler locationBefore locating the boiler, check Provide clearancesResidential garage installation Flooring and foundationProvide air openings to room Vent and air pipingSeal any unused openings in the common venting system When removing a boiler from existing common vent systemPrevent combustion air contamination Prepare for propane if operating on propane Ultra-80 Prepare boilerRemove boiler from crate Prepare for propane if operating on propane Ultra-155 to Placing floor-mounted boilersPlacing wall-mounted boilers Set boiler in place and check levelPerform hydrostatic pressure test Prepare boiler for testFill and pressure test Drain and remove fittingsInstall water piping Install relief valveAdditional controls, when required General piping informationSizing space heat system piping System water piping methodsCirculators Sizing DHW system piping Required boiler water flow rate, GPM, at 180FControlling the system circulator Zoning with zone valvesConnect boiler to system as shown in when Zoning with circulators Setting boiler outlet water target temperature Radiant heating applicationsChilled water systems Chilled water system plus optionalPrepare condensate fittings Install vent and combustion air pipingVenting, combustion air & condensate line Connect condensate drain Condensate drain Ultra-80Wall-mounted boilers Connecting gas supply pipingGas piping Natural Gas Propane GasPipe sizing for natural gas Natural gas supply pressure requirementsFreeze protection when used StartupCheck/control water chemistry Fill and test water systemCheck for gas leaks Final checks before starting boiler Check thermostat circuitsInspect/fill condensate system To start the boilerCheck flame & combustion Adjust and test boiler controlsCheck system and boiler Check-out/startup verification Check-out/startup verification Installation certificate Annual startup and general maintenance Service and maintenance schedulesAnnual startup Handling ceramic fiber materialsClean condensate trap Check water systemCheck all piping for leaks Check expansion tank Check air openingsCheck ignition ground wiring Check all boiler wiringCheck control settings Check boiler relief valveCheck flame signal Check flue gas temperaturePerform startup and checks Check burner flameMaintenance general General maintenanceCleaning boiler heat exchanger Replace boiler jacket front door after startup or servicingExchanger cleaning ALL models Maintenance and annual startupAccess exchanger Ultra-155, -230, -310 Only Replacement parts Jacket parts Replacement parts Heat exchanger and piping Ultra-80 Replacement parts Heat exchanger and piping Ultra-155 to Replacement parts Controls Dimensions Ratings DOE