Weil-McLain
310, 80, 230, 105, 155
manual
Controls
Install
Check flame signal
Connecting gas supply piping
Dimension
Maintenance
Check control settings
Clean condensate trap
How to
Replacement parts
Page 42
9
GAS
-
FIRED
WATER BOILER
— Boiler Manual
Replacement parts
(continued)
Controls
42
Part number
550-101-233/0903
Page 41
Page 43
Image 42
Page 41
Page 43
Contents
Gas-fired water boiler
HOW IT Works
GAS-FIRED Water BOILER, with PhD Technology
Contents
Hazard definitions
Boiler operation
When servicing boiler
Please read before proceeding
Boiler water
Before locating the boiler, check
Installations must comply with
Prepare boiler location
Provide clearances
Provide air openings to room
Residential garage installation
Flooring and foundation
Vent and air piping
When removing a boiler from existing common vent system
Prevent combustion air contamination
Seal any unused openings in the common venting system
Prepare boiler
Remove boiler from crate
Prepare for propane if operating on propane Ultra-80
Placing wall-mounted boilers
Prepare for propane if operating on propane Ultra-155 to
Placing floor-mounted boilers
Set boiler in place and check level
Fill and pressure test
Perform hydrostatic pressure test
Prepare boiler for test
Drain and remove fittings
Additional controls, when required
Install water piping
Install relief valve
General piping information
System water piping methods
Circulators
Sizing space heat system piping
Sizing DHW system piping
Required boiler water flow rate, GPM, at 180F
Zoning with zone valves
Connect boiler to system as shown in when
Controlling the system circulator
Zoning with circulators
Setting boiler outlet water target temperature
Radiant heating applications
Chilled water systems
Chilled water system plus optional
Install vent and combustion air piping
Venting, combustion air & condensate line
Prepare condensate fittings
Connect condensate drain
Condensate drain Ultra-80
Connecting gas supply piping
Gas piping
Wall-mounted boilers
Pipe sizing for natural gas
Natural Gas
Propane Gas
Natural gas supply pressure requirements
Check/control water chemistry
Freeze protection when used
Startup
Fill and test water system
Inspect/fill condensate system
Check for gas leaks Final checks before starting boiler
Check thermostat circuits
To start the boiler
Adjust and test boiler controls
Check system and boiler
Check flame & combustion
Check-out/startup verification
Check-out/startup verification Installation certificate
Annual startup and general maintenance
Service and maintenance schedules
Annual startup
Handling ceramic fiber materials
Check all piping for leaks Check expansion tank
Clean condensate trap
Check water system
Check air openings
Check control settings
Check ignition ground wiring
Check all boiler wiring
Check boiler relief valve
Perform startup and checks
Check flame signal
Check flue gas temperature
Check burner flame
Cleaning boiler heat exchanger
Maintenance general
General maintenance
Replace boiler jacket front door after startup or servicing
Maintenance and annual startup
Access exchanger Ultra-155, -230, -310 Only
Exchanger cleaning ALL models
Replacement parts
Jacket parts
Replacement parts
Heat exchanger and piping Ultra-80
Replacement parts
Heat exchanger and piping Ultra-155 to
Replacement parts
Controls
Dimensions
Ratings
DOE
Related manuals
Manual
40 pages
58.65 Kb
Related pages
User instructions Troubleshooting for Smeg DWF66WH
Specifications 11-1 for Delta Electronics ASDA-B Series
Error Message? for JVC GSTD1BUS
Circuit Diagram CPU for Sharp AR-PB8
When the CD or video program is completed, for Healthrider HCTL05910
How to install the detacheable stand for Sceptre Technologies X7S-NagaV
Parts List for Brinkmann Series 6419
Language Code List for JVC HR-XVC26U
Activating/Deactivating Standby mode for Spectra GL612
Posibilidad DE Conectar 8 Aparatos Bluetooth for Mr Handsfree none
What steps do I follow to stop printing from the control panel?
Find out here
Top
Page
Image
Contents