Weil-McLain 80, 230, 310, 105 Zoning with zone valves, Connect boiler to system as shown in when

Page 15

3 GAS-FIRED WATER BOILER — Boiler Manual

Install water piping (continued)

Zoning with zone valves

Figure 7

Zone valve zoning plus optional

1.

Connect boiler to system as shown in Figure 7 when

 

DHW piping

 

 

 

zone valve zoning. The primary/secondary piping

 

 

 

shown ensures the boiler loop will have sufficient

 

 

 

flow. It also avoids applying the high head of the

 

 

 

boiler circulator to the zone valves.

 

 

2.

When using a closed-type expansion tank, connect

 

 

 

the expansion tank and make-up water piping as

 

 

 

shown in Figure 4, page 13.

 

 

3.

Connect DHW (domestic hot water) piping to indirect

 

 

 

storage water heater as shown.

 

 

 

 

The

PhDControl Module turns off

 

 

 

 

 

 

space heating during DHW heating. The boiler circulator will turn off, preventing hot water from circulating to the system. The flow/check valve shown on the boiler outlet piping prevents gravity circulation in the boiler loop during DHW heating.

4.Controlling the system circulator

a.To cycle the system circulator from the Ultra PhD control module, add a circulator relay wired to the boiler circulator terminals as shown in the Ultra Control Supplement.

NOTE 1: To ensure adequate flow rate through the boiler, use the following pipe size on all boiler loop piping (connecting boiler to and from the primary/secondary connection, item 21): Ultra-80 or Ultra-105 – 1" or larger.

Ultra-155 or -230 – 1¼" or larger. Ultra-310 – 1½" or larger.

Use at least the minimum piping size above and pipe the boiler using only primary/ secondary piping as shown. Failure to follow these guidelines could result in system problems.

Legend

Figure 7

1Ultra boiler

2Indirect water heater (DHW), if used

3Boiler relief valve (see page 12 for piping details)

4Relief valve discharge piping (see page 12 for details)

5DHW circulator (see page 14 for suggested sizing)

6Isolation valves

7System circulator

8Diaphragm (or bladder) type expansion tank (see page 12 for piping of closed-type expansion tank, if used)

9Air separator [with automatic air vent only on systems using diaphragm (or bladder) type expansion tank]

10Flow/check valves (with weighted seats to prevent gravity circulation)

11Purge/drain valves

12Boiler circulator

13Zone valves, typical

20Make-up water supply

21Primary/secondary connection

Part number 550-101-233/0903

15

Image 15
Contents Gas-fired water boiler HOW IT Works GAS-FIRED Water BOILER, with PhD Technology Hazard definitions ContentsBoiler water When servicing boilerPlease read before proceeding Boiler operationProvide clearances Installations must comply withPrepare boiler location Before locating the boiler, checkVent and air piping Residential garage installationFlooring and foundation Provide air openings to roomWhen removing a boiler from existing common vent system Prevent combustion air contaminationSeal any unused openings in the common venting system Prepare boiler Remove boiler from cratePrepare for propane if operating on propane Ultra-80 Set boiler in place and check level Prepare for propane if operating on propane Ultra-155 toPlacing floor-mounted boilers Placing wall-mounted boilersDrain and remove fittings Perform hydrostatic pressure testPrepare boiler for test Fill and pressure testGeneral piping information Install water pipingInstall relief valve Additional controls, when requiredSystem water piping methods CirculatorsSizing space heat system piping Required boiler water flow rate, GPM, at 180F Sizing DHW system pipingZoning with zone valves Connect boiler to system as shown in whenControlling the system circulator Zoning with circulators Radiant heating applications Setting boiler outlet water target temperatureChilled water system plus optional Chilled water systemsInstall vent and combustion air piping Venting, combustion air & condensate linePrepare condensate fittings Condensate drain Ultra-80 Connect condensate drainConnecting gas supply piping Gas pipingWall-mounted boilers Natural gas supply pressure requirements Natural GasPropane Gas Pipe sizing for natural gasFill and test water system Freeze protection when usedStartup Check/control water chemistryTo start the boiler Check for gas leaks Final checks before starting boilerCheck thermostat circuits Inspect/fill condensate systemAdjust and test boiler controls Check system and boilerCheck flame & combustion Check-out/startup verification Check-out/startup verification Installation certificate Service and maintenance schedules Annual startup and general maintenanceHandling ceramic fiber materials Annual startupCheck air openings Clean condensate trapCheck water system Check all piping for leaks Check expansion tankCheck boiler relief valve Check ignition ground wiringCheck all boiler wiring Check control settingsCheck burner flame Check flame signalCheck flue gas temperature Perform startup and checksReplace boiler jacket front door after startup or servicing Maintenance generalGeneral maintenance Cleaning boiler heat exchangerMaintenance and annual startup Access exchanger Ultra-155, -230, -310 OnlyExchanger cleaning ALL models Replacement parts Jacket parts Replacement parts Heat exchanger and piping Ultra-80 Replacement parts Heat exchanger and piping Ultra-155 to Replacement parts Controls Dimensions DOE Ratings