Weil-McLain
105, 230, 310, 155
manual
Heat exchanger and piping Ultra-80
Install
Check flame signal
Connecting gas supply piping
Dimension
Maintenance
Check control settings
Clean condensate trap
How to
Replacement parts
Page 38
9
GAS
-
FIRED
WATER BOILER
— Boiler Manual
Replacement parts
(continued)
Heat exchanger and piping —
Ultra-80
&
-105
38
Part number
550-101-233/0903
Page 37
Page 39
Image 38
Page 37
Page 39
Contents
Gas-fired water boiler
HOW IT Works
GAS-FIRED Water BOILER, with PhD Technology
Contents
Hazard definitions
Boiler operation
When servicing boiler
Please read before proceeding
Boiler water
Before locating the boiler, check
Installations must comply with
Prepare boiler location
Provide clearances
Provide air openings to room
Residential garage installation
Flooring and foundation
Vent and air piping
Seal any unused openings in the common venting system
When removing a boiler from existing common vent system
Prevent combustion air contamination
Prepare for propane if operating on propane Ultra-80
Prepare boiler
Remove boiler from crate
Placing wall-mounted boilers
Prepare for propane if operating on propane Ultra-155 to
Placing floor-mounted boilers
Set boiler in place and check level
Fill and pressure test
Perform hydrostatic pressure test
Prepare boiler for test
Drain and remove fittings
Additional controls, when required
Install water piping
Install relief valve
General piping information
Sizing space heat system piping
System water piping methods
Circulators
Sizing DHW system piping
Required boiler water flow rate, GPM, at 180F
Controlling the system circulator
Zoning with zone valves
Connect boiler to system as shown in when
Zoning with circulators
Setting boiler outlet water target temperature
Radiant heating applications
Chilled water systems
Chilled water system plus optional
Prepare condensate fittings
Install vent and combustion air piping
Venting, combustion air & condensate line
Connect condensate drain
Condensate drain Ultra-80
Wall-mounted boilers
Connecting gas supply piping
Gas piping
Pipe sizing for natural gas
Natural Gas
Propane Gas
Natural gas supply pressure requirements
Check/control water chemistry
Freeze protection when used
Startup
Fill and test water system
Inspect/fill condensate system
Check for gas leaks Final checks before starting boiler
Check thermostat circuits
To start the boiler
Check flame & combustion
Adjust and test boiler controls
Check system and boiler
Check-out/startup verification
Check-out/startup verification Installation certificate
Annual startup and general maintenance
Service and maintenance schedules
Annual startup
Handling ceramic fiber materials
Check all piping for leaks Check expansion tank
Clean condensate trap
Check water system
Check air openings
Check control settings
Check ignition ground wiring
Check all boiler wiring
Check boiler relief valve
Perform startup and checks
Check flame signal
Check flue gas temperature
Check burner flame
Cleaning boiler heat exchanger
Maintenance general
General maintenance
Replace boiler jacket front door after startup or servicing
Exchanger cleaning ALL models
Maintenance and annual startup
Access exchanger Ultra-155, -230, -310 Only
Replacement parts
Jacket parts
Replacement parts
Heat exchanger and piping Ultra-80
Replacement parts
Heat exchanger and piping Ultra-155 to
Replacement parts
Controls
Dimensions
Ratings
DOE
Related manuals
Manual
40 pages
58.65 Kb
Related pages
Troubleshooting for Miller Electric PipePro 304
Specifications for HP Dv6 7363cl Refurb D1B19UARABA
Error messages for Pioneer DEH-22UB
Lubrication Chart for Husqvarna 6021P
Where to find… for Bose 131
Installation for Smeg KSEC6
Parts List a / Assembly Diagram for Harbor Freight Tools 47065
Code List for GE RM94948
Switch for AT&T 585-310-231
How do I add security to my
HP Deskjet 6980
wireless network?
Top
Page
Image
Contents