Weil-McLain 310, 80 Radiant heating applications, Setting boiler outlet water target temperature

Page 17

3 GAS-FIRED WATER BOILER — Boiler Manual

Install water piping (continued)

Radiant heating applications

Figure 9

 

1.The Ultra boiler is ideal for use in radiant heating. The Ultra boiler’s unique heat exchanger design allows it to work well even in condensing mode. So there is no need to regulate boiler return water temperature in radiant heating applications.

2.Connect boiler to system as shown in Figure 9 for typical radiant heating applications. The primary/secondary piping shown ensures the boiler loop will have sufficient flow. Size the system piping and circulator to provide the flow and pressure drop needed for the radiant system.

3.Add the high limit control (Figure 9, item 22) to ensure supply water temperature will not exceed the maximum allowable for the radiant system. Wire this limit control between low voltage terminal strip terminals 6 and 7.

4.When using a closed-type expansion tank, connect the expansion tank and make-up water piping as shown in Figure 4, page 13.

5.Connect DHW (domestic hot water) piping to indirect storage water heater as shown.

The PhDControl Module turns off space heating during DHW heating. The boiler circulator will turn off, preventing hot water from circulating to the system. The flow/check valve shown on the boiler outlet piping prevents gravity circulation in the boiler loop during DHW heating.

6.Controlling the system circulator

a.To cycle the system circulator from the Ultra PhD control module, add a circulator relay wired to the boiler circulator terminals as shown in the Ultra Control Supplement

7.Setting boiler outlet water target temperature.

a.Follow procedure in Ultra Control Supplement to set space heating target temperature to the desired supply temperature for the system. For outdoor reset operation, install and connect the outdoor temperature sensor supplied with the boiler.

NOTE 1: To ensure adequate flow rate through the boiler, use the following pipe size on all boiler loop piping (connecting boiler to and from the primary/secondary connection, item 21):

Ultra-80 or Ultra-105 – 1" or larger. Ultra-155 or -230 – 1¼" or larger. Ultra-310 – 1½" or larger.

Typical radiant heating system piping plus optional DHW

Use at least the minimum piping size at left and pipe the boiler using only primary/ secondary piping as shown. Failure to follow these guidelines could result in system problems.

Legend

Figure 9

1Ultra boiler

2Indirect water heater (DHW), if used

3Boiler relief valve (see page 12 for piping details)

4Relief valve discharge piping (see page 12 for details)

5DHW circulator (see page 14 for suggested sizing)

6Isolation valves

7System circulator

8Diaphragm (or bladder) type expansion tank (see page 12 for piping of closed- type expansion tank, if used)

9Air separator [with automatic air vent only on systems using diaphragm (or bladder) type expansion tank]

10Flow/check valves (with weighted seats to prevent gravity circulation)

11Purge/drain valves

12Boiler circulator

13Zone valves, when used (zoning may also be done using manifold-mounted valve actuators)

20Make-up water supply

21Primary/secondary connection

22High limit temperature control, set to protect radiant tubing

Part number 550-101-233/0903

17

Image 17
Contents Gas-fired water boiler HOW IT Works GAS-FIRED Water BOILER, with PhD Technology Hazard definitions ContentsPlease read before proceeding When servicing boilerBoiler operation Boiler waterPrepare boiler location Installations must comply withBefore locating the boiler, check Provide clearancesFlooring and foundation Residential garage installationProvide air openings to room Vent and air pipingSeal any unused openings in the common venting system When removing a boiler from existing common vent systemPrevent combustion air contamination Prepare for propane if operating on propane Ultra-80 Prepare boilerRemove boiler from crate Placing floor-mounted boilers Prepare for propane if operating on propane Ultra-155 toPlacing wall-mounted boilers Set boiler in place and check levelPrepare boiler for test Perform hydrostatic pressure testFill and pressure test Drain and remove fittingsInstall relief valve Install water pipingAdditional controls, when required General piping informationSizing space heat system piping System water piping methodsCirculators Required boiler water flow rate, GPM, at 180F Sizing DHW system pipingControlling the system circulator Zoning with zone valvesConnect boiler to system as shown in when Zoning with circulators Radiant heating applications Setting boiler outlet water target temperatureChilled water system plus optional Chilled water systemsPrepare condensate fittings Install vent and combustion air pipingVenting, combustion air & condensate line Condensate drain Ultra-80 Connect condensate drainWall-mounted boilers Connecting gas supply pipingGas piping Propane Gas Natural GasPipe sizing for natural gas Natural gas supply pressure requirementsStartup Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaks Final checks before starting boilerInspect/fill condensate system To start the boilerCheck flame & combustion Adjust and test boiler controlsCheck system and boiler Check-out/startup verification Check-out/startup verification Installation certificate Service and maintenance schedules Annual startup and general maintenanceHandling ceramic fiber materials Annual startupCheck water system Clean condensate trapCheck all piping for leaks Check expansion tank Check air openingsCheck all boiler wiring Check ignition ground wiringCheck control settings Check boiler relief valveCheck flue gas temperature Check flame signalPerform startup and checks Check burner flameGeneral maintenance Maintenance generalCleaning boiler heat exchanger Replace boiler jacket front door after startup or servicingExchanger cleaning ALL models Maintenance and annual startupAccess exchanger Ultra-155, -230, -310 Only Replacement parts Jacket parts Replacement parts Heat exchanger and piping Ultra-80 Replacement parts Heat exchanger and piping Ultra-155 to Replacement parts Controls Dimensions DOE Ratings
Related manuals
Manual 40 pages 58.65 Kb