Heatiator CB4236IR, CB4842IR owner manual Finishing, Facing Material

Page 28

13 Finishing

A. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing closer than the minimums listed must be constructed entirely of noncombustible materials (i.e., steel studs, concrete board, etc.) Failure to comply could cause fire.

Mantels

 

 

 

 

 

 

 

 

 

 

 

30 in. minimum

 

 

 

 

 

 

 

 

 

 

 

to ceiling

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

16

17

 

 

 

 

 

 

 

 

 

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

15-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14-1/2

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

 

12

13-3/4

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

12-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

11-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10-3/4

 

 

 

 

 

 

 

 

8

10

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

6

9-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

8-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-3/4

 

 

 

 

 

 

 

 

4

7

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

5-1/26-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

Measured from top of hood (in inches)

Figure 13.1 Minimum Vertical and Maximum Horizontal Dimen- sions

Mantel Legs or Wall Projections

Top of

 

Appliance

Drywall

 

A

B

Mantel Leg or

Perpendicular Wall

A1 in. (25 mm) min. to perpendicular wall

B3-1/2 in. (89 mm) min. from fireplace opening to perpendicular wall

Figure 13.2 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

B. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

Seal joints between the finished wall and appliance top and sides using a 300 °F minimum sealant. Refer to Figure 13.3.

WARNING! Risk of Fire! DO NOT apply combustible ma- terials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will inter- fere with proper operation of doors and louvers.

These surfaces

may be covered

with non-combustible

material.

Non-combustible

sealant.

Figure 13.3 Noncombustible Facing Diagram

28

Heatilator • Caliber BV Series • 4040-262 • Rev M • 08/09

Image 28
Contents Models CB4236IR CB4842IR Vent Gas Appliance Installation and OperationWhat to do if you smell gas Congratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide  a Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyWarranty This warranty is void ifListing and Code Approvals Operating Instructions Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceFor Your Safety Read Before Lighting Lighting Instructions IPI L. Flame Adjustment Control Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Negative Pressure Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Width Height Depth Model Rough Opening Rough OpeningMantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesVent System Configuration Vent Information and DiagramsVent Guidelines Vent Clearances and Framing Pipe Clearances to CombustiblesWall and Ceiling Penetration Framing Vertical Penetration FramingAppliance Preparation Gas and Electrical ConnectionsInstalling Vent Pipe Assembly of Vent SectionsInstall Attic Insulation Shield Secure Vent SectionsGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsIntellifire Ignition System Wiring Electrical Service and RepairJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Glass Assembly Install the Log AssemblyFirescreen Air Shutter Setting Install Louvers and TrimHood Troubleshooting Intellifire Ignition SystemHave accumulated on flame sensing rod Appliance Dimension Diagram Reference Materials B. Service Parts List CB4236IRService Parts List CB4842IRIPI Valve Assembly  C. Optional Components Optional Components Model # DescriptionContact Information