Heatiator BCDV36 manual Junction BOX Installation and Wiring, Wall Switch

Page 16

BUILDER'S CHOICE SERIES INSTALLATION INSTRUCTIONS

4. WIRING

Standing Pilot Ignition - Millivolt System

a.Appliance Requirements

A wiring diagram is shown in Figure 27.

b.Wall Switch

The installer shall supply UL or in Canada, CSA- listed wall switch and wiring between appliance and wall switch. This appliance was tested with eighteen feet of UL Listed 18 ga. Type CL2 105°C, two conductor “thermostat wire.” If other wiring materials are used they shall comply with local codes or in the absence of local codes, with

National Electrical Code ANSI/NFPA 70-latest edition or Canadian Electrical Code CSA C22.1.

c.Optional Accessories Requirements

Wiring for optional accessories should be done now to avoid reconstruction.

5.JUNCTION BOX INSTALLATION AND WIRING

Note: This appliance must be electrically wired and grounded in accordance with local codes. In the absence of local codes, the wiring must comply with the National Electric Code ANSI/NFPA 70 - latest edition or the Canadian Electric Code CSA C22.1.

WARNING!

This standing pilot appliance does not require a 110V AC power supply for operation. Connecting the appli- ance/wall switch to a 110V AC will cause the appli- ance to malfunction and destroy the valve and ther- mopile.

Refer to the installation instructions included with the JK9 Junction Box Kit and the insert of Figure 27.

14-3 with Ground Romex is the recommended wiring to the appliance Junction Box.

Detailed picture of the Junc- tion Box (Optional for Stand- ing Pilot Appliances).

Figure 27

Standing Pilot Ignition Wiring Diagram

33606 Rev D

16

01-03

Image 16
Contents Installation & Operating Instructions Please retain this manual for future reference Appliance Specifications Glass CERTIFICATIONS/SPECIFICATIONSS. and Canada Certification Local CodesBuilders Choice Series Installation Instructions Builders Choice Nomenclature NomenclatureCatalog # Description Appliance Locations and Space Requirements Location and ClearancesClearances Wear gloves and safety glasses for protection Setting the ApplianceFraming Installing the Interior Wall Shield VentingHorizontal Termination TerminationNo Elbows Rear Vented Appliances 45 ElbowOne 45 Elbow Two Elbows Two Elbows Three Elbows One Elbow HorizontalDimension Descriptions Termination Cap LocationsVertical Termination ClearancesVent Clearances Vent Lengths Vent SupportInstalling the Firestop Spacer Roof Pitch Min. Ft Firestop Spacer/Chimney InstallationChimney Height Chase/Termination Installation Assembling Minimum Installations MI Sections Assembling Vent SectionsAttaching the Venting to the Appliance Assembling Vent SectionsAssembling Slip Sections Disassembling Vent Sections only if NecessaryUtilities GAS Line ConnectionGAS Pressure GAS ConversionsWiring Junction BOX Installation and WiringWall Switch Standing Pilot Ignition Wiring DiagramFinishing Glass and Screen Replacement Appliance PreparationLOG SET Placing the Vermiculite and Lava RockLighting Instructions Do not light by handPrior to Operation Seasonal ChecklistStanding Pilot Operation Maintenance Instructions START-UP IssuesFuel Conversion LOG REMOVAL/REPLACEMENT Cleaning the GlassGlass Cleaning Optional Components Fan KitReplacement Parts BCDV36 Gas Log AssemblyHOMEOWNER’S Notes HOMEOWNER’S Notes Index Limited Lifetime Warranty Year Limited WarrantyHow to Obtain Service Conditions, Exclusions, & Limitations of Liability