Heatiator BCDV36 manual Finishing

Page 17

BUILDER'S CHOICE SERIES INSTALLATION INSTRUCTIONS

I. FINISHING

1. COMBUSTIBLE FINISHING MATERIAL

Materials made of or surfaced with wood, compressed paper, plant fibers, plastics, or any material capable of igniting and burning, whether flame proofed or not, plastered or unplastered (this includes drywall) are considered to be combustible.

2.NONCOMBUSTIBLE FINISHING MATE- RIAL

Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick, tile, concrete, slate, glass or plasters, or combination thereof, or have a UL Fire rating of Zero (0).

3.HIGH TEMPERATURE SEALANT MATE- RIAL

Sealants that will withstand high temperatures: General Electric RTV103 (Black) or equivalent; Rutland, Inc. Appliance Mortar #63 or equivalent.

A high temperature sealant, 1/8” wide minimum, must be used to close off gaps between the appliance and facing to prevent cold air leaks. See Figure 28.

4. ATTACHING THE HOOD

The hood must be attached or a fire hazard may result. Simply slide the hood under the three screws above the appliance opening. See Figure 29.

5. GLASS AND SCREEN REMOVAL

See page 22 of this manual.

WARNING!

Grilles and hoods on this appliance cannot, in any way, be covered as it may create a fire hazard.

Figure 28

Finishing Materials

Figure 29

Hood Placement

01-03

17

33606 Rev D

Image 17
Contents Installation & Operating Instructions Please retain this manual for future reference Glass CERTIFICATIONS/SPECIFICATIONS Appliance SpecificationsS. and Canada Certification Local CodesBuilders Choice Series Installation Instructions Catalog # Description NomenclatureBuilders Choice Nomenclature Clearances Location and ClearancesAppliance Locations and Space Requirements Framing Setting the ApplianceWear gloves and safety glasses for protection Venting Installing the Interior Wall ShieldHorizontal Termination TerminationRear Vented Appliances 45 Elbow No ElbowsOne 45 Elbow Two Elbows Two Elbows Three Elbows One Elbow HorizontalTermination Cap Locations Dimension DescriptionsClearances Vertical TerminationVent Clearances Vent Lengths Vent SupportChimney Height Chase/Termination Installation Firestop Spacer/Chimney InstallationInstalling the Firestop Spacer Roof Pitch Min. Ft Assembling Vent Sections Assembling Minimum Installations MI SectionsAttaching the Venting to the Appliance Assembling Vent SectionsDisassembling Vent Sections only if Necessary Assembling Slip SectionsGAS Line Connection UtilitiesGAS Pressure GAS ConversionsJunction BOX Installation and Wiring WiringWall Switch Standing Pilot Ignition Wiring DiagramFinishing Appliance Preparation Glass and Screen ReplacementLOG SET Placing the Vermiculite and Lava RockDo not light by hand Lighting InstructionsStanding Pilot Operation Seasonal ChecklistPrior to Operation Fuel Conversion START-UP IssuesMaintenance Instructions Glass Cleaning Cleaning the GlassLOG REMOVAL/REPLACEMENT Fan Kit Optional ComponentsBCDV36 Gas Log Assembly Replacement PartsHOMEOWNER’S Notes HOMEOWNER’S Notes Index Year Limited Warranty Limited Lifetime WarrantyHow to Obtain Service Conditions, Exclusions, & Limitations of Liability