Desa CGP11A installation manual Placing Heater On Mounting Screws

Page 12

INSTALLING TO WALL

Continued

Placing Heater On Mounting Screws

1.Locate two keyhole slots on back panel of heater (see Figure 9).

2.Place large openings of slots over screwheads. Slide heater down until screws are in small portion of slots.

Keyhole Slots

Figure 9 - Location Of Keyhole Slots On Back Panel Of Heater

Removing Front Panel Of Heater

1.Remove two screws near bottom corners of front panel.

2.Lift straight up on grill guard until it stops. Grill guard will slide up about 1/4".

3.Pull bottom of front panel forward, then down.

Figure 10 - Removing Front Panel Of Heater

Installing Bottom Mounting Screw

1.Locate bottom mounting hole. This hole is near bottom on back panel of heater (see Figure 11).

2.Mark screw location on wall.

3.Remove heater from wall.

4.If installing bottom mounting screw into hollow or solid wall, install wall anchor. Follow steps 1 through 5 under Attaching To Wall Anchor Method, page 11.

If installing bottom mounting screw into wall stud, drill hole at marked location using 9/64" drill bit.

5.Replace heater on wall.

6.Insert bottom anchor screw through back panel into bottom anchor or drilled hole (see Figure 11).

7.Tighten screw until heater is firmly secured to wall. Do not over tighten. Note: Do not replace front panel at this time. Replace front panel after making gas connections and checking for leaks (see pages 13-15).

12

Figure 11 - Installing Bottom Mounting Screw

100846

Image 12
Contents OWNER’S Operation and Installation Manual What to do if YOU Smell GASContents Safety Information Safety Device ProductLocal Codes UnpackingFresh AIR For CombustionVentilation Producing Adequate VentilationFresh AIR Determining FRESH-AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Fresh AIR for Combustion and Ventilation Ventilation AIRVentilation Air From Inside Building Ventilation AIR Ventilation Air From OutdoorsInstalling To Wall Installation ItemsCheck GAS Type Locating HeaterInstalling Heater to Wall Marking Screw LocationsInstalling Two Mounting Screws Folding AnchorPlacing Heater On Mounting Screws Connecting To GAS Qualified service person must connect heater to gas supplySupply Follow all local codesPressure Testing GAS Supply Piping System Checking GASConnections Servicing. Correct all leaks at oncePressure Testing Heater GAS Connections CheckingFor Your Safety Read Before Lighting Operating HeaterPilot To Select Heating Level Heater InspectingBurner Pilot Flame PatternInspecting Burner Burner Flame PatternTrouble Shooting ODS/PILOT and Burner OrificeCabinet See Cleaning TROUBLE- ShootingMaintenance, Technical Service Ing statement atTop Service Replacement PartsParts Under Warranty Parts Not Under WarrantyService Publications Accessory Parts CentralsValve GA5010 Parts List Illustrated Parts BreakdownWarranty Information Keep this Warranty