19
SECONDARY AIR TUBEFIREBRICK AND BAFFLE
REMOVAL / INSTALLATIONINSTALLATION
OPTIONAL NZ64 BLOWER KIT INSTALLATION
Route a 120 Volt, 60Hz electrical supply (not supplied) from the electrical box on the side of the unit to the electrical box on the blower housing.
The unit comes complete with a safety switch and a ther- mally activated switch.