Napoleon Fireplaces GE38NT-M Using Flexible Vent Components, Horizontal AIR Terminal Installation

Page 13

13

USING FLEXIBLE VENT COMPONENTS

Use only approved aluminum flexi- ble liner kits marked:

"Wolf Steel Approved Venting" as identified by the stamp only on the 7” outer liner.

HORIZONTAL AIR TERMINAL INSTALLATION

FIGURE 19

1. Cut or frame a hole in an exterior wall with a minimum

round or square opening listed on page 5. Secure the

firestop spacer over the opening to the interior wall.

2. Stretch the 4" diameter aluminum flexible liner to the

required length taking into account the additional length

EXTENDED HORIZONTAL

AIR TERMINAL INSTALLATION

Use the GD220 vent kit and couplers for this application.

If more than one length of liner needs to be used to reach the fireplace, couple them together as illustrated in FIGURE 20. Seal the joints using the same procedure as described in points 2 and 3. The vent system must be sup- ported approximately every 3 feet for both vertical and hori- zontal runs. Use Wolf Steel support ring assemblies, or equivalent noncombustible strapping to maintain the mini- mum 1" clearance to combustibles as well as to prevent sagging.

Spacers are attached to the 4" inner flex liner at prede- termined intervals to maintain a 1-1/4" air gap to the 7" outer liner. These spacers must not be removed.

FIGURE 20

VERTICAL AIR TERMINAL INSTALLATION

needed for the finished wall surface. Slip the liner a mini-

mum of 2" over the inner sleeve of the air terminal and

secure with 3 #8 screws. Apply a heavy bead of the high

temperature sealant.

3. Using the 7" diameter flexible aluminum liner, slide

over the outer combustion air sleeve of the air terminal and

secure with 3 #8 screws. Seal as before.

4. Insert the liners through the firestop maintaining the

required clearance to combustibles. Holding the air termi-

nal (lettering in an upright, readable position), secure to

the exterior wall and make weather tight by sealing with

caulking (not supplied).

5. Apply a heavy bead of the high temperature sealant,

supplied with the unit, to the inside of the 4" liner approxi-

mately 1" from the end. Slip the liner a minimum of 2" over

the fireplace vent collar and secure with 3 #8 screws.

6. Using the 7" diameter flexible aluminium liner, apply

sealant, slide a minimum of 2" over the fireplace combus-

tion air collar and secure with 3 #8 screws.

1.Fasten the roof support to the roof using the screws pro- vided. FIGURE 21. The roof sup- port is optional. In this case the venting is to be adequately sup- ported using either an alternate method suitable to the authority having jurisdiction or the op- tional roof support.

2.Stretch the 4" diameter alu- minium flexible liner to the re- quired length. Slip the liner a minimum of 2" over the inner sleeve of the air terminal and se- cure with 3 #8 screws. Seal us- ing a heavy bead of the high temperature sealant.

3.Repeat using the 7" diam- eter flexible aluminium liner.

FIGURE 21

FIGURE 22

4.Thread the air terminal pipe assembly down through the roof. The air terminal must be located vertically and plumb. Attach the air terminal assembly to the roof support, ensuring that a minimum 16" of air terminal will penetrate the roof when fastened.

DO NOT CLAMP THE FLEXIBLE ALUMINIUM LINER.

5.Remove nails from the shingles, above and to the sides of the chimney. Place the flashing over the air termi- nal and slide it underneath the sides and upper edge of the shingles. Ensure that the air terminal is properly centered within the flashing, giving a 3/4" margin all around. Fasten to the roof.

W415-0429 / C / 11.04.05

Image 13
Contents Direct Vent Millivolt System Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Information General InstructionsCare of GLASS, and Plated Parts Venting Lengths VentingAIR Terminal Installations Special Vent Installations Typical Vent InstallationsVenting Application Flow Chart Horizontal Termination Vertical TerminationDefinitions TOP Exit / Horizontal TerminationElbow Vent Length Values 90 H2 H3 90 V1 H3 H1 2 TOP Exit Vertical Termination90 H Horizontal Installation Installation Wall and Ceiling ProtectionVertical Installation Horizontal AIR Terminal Installation Using Flexible Vent ComponentsFireplace Vent Connection Using Rigid Vent ComponentsGAS Installation Vertical Venting InstallationFraming Mobile Home InstallationNailing Tabs Gvfl Louvre Installation L38 Louvre Installation Door Removal & InstallationFinishing LOG Placement Flame Effect Bulb Replacement Blower ReplacementOperation Ember BED Bulb ReplacementFireplace Operation Hand Held Remote OperationOperating Instructions MaintenanceElectrical Diagram Legend Hard Wiring ConnectionElectrical Connection Pilot Burner Adjustment AdjustmentsVenturi Adjustment Replacements 3427 Symptom Problem Test Solution Trouble Shooting GuideDo not Clean Glass When HOT Electric Trouble ShootingWolf Steel Fireplace Service History